Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
This website will transition to a NEW 511 site. Start using it NOW & give us feedback.
ID 75 in both directions: Road construction.
ID 75 in both directions: Road construction.

Between Old Highway 93 (7 miles north of the Shoshone area) and Old Highway 93 (17 miles south of the Bellevue area). Road construction work is in progress. Bridge construction work is in progress. The road is being repaved. A seal coat treatment has been applied. Look out for loose gravel on the roadway. The roadway is reduced to one lane. Look out for flaggers. A pilot car is in operation. Expect delays. Speed restrictions are in force. There is a width limit in effect. Expect 10 - minute delays. Speed limit 35 MPH. Width limit 14'0". Until September 2, 2020 at about 5:00PM MDT.

Web Comment: Plant mix overlay, warranty seal coat, bridge repair and guardrail replacement. Contractor: Western Construction 208-850-2812 Traffic Control: Roundabout Contractors 208-881-1088

Last updated on July 27