Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
This website will transition to a NEW 511 site. Start using it NOW & give us feedback.
I-84 in both directions: Road construction, work on the shoulder, work in the median, paving operations, observe signs, roadway reduced to one lane, left lane closed, consider using an alternate route, speed restrictions in force, width limit in effect.
I-84 in both directions: Road construction.

Between Exit 165: ID 25 and Exit 173: US 93 (4 miles east of the Jerome area). Road construction work is in progress. There is work on the shoulder. People are working in the median. The road is being repaved. Observe the signs. The roadway is reduced to one lane. The left lane is closed. Consider using an alternate route. Speed restrictions are in force. There is a width limit in effect. Speed limit 70 MPH. Width limit 12'0". Until August 20, 2020 at about 5:30PM MDT.

Web Comment: Watch for construction workers and equipment working in the median constructing traffic cross overs and installing new storm water devices. Both east and westbound passing lanes closed. Contractor: Western Construction 208-345-1440 Traffic Control: Aspen: 208-250-7150 ITD contact: Brock Dille 208-886-7800

Last updated on August 13
I-84 in both directions: Road construction.
Map of I-84 in both directions: Road construction.
Zoom In
Zoom Out
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Warning Roadwork
Info Info Health Warning Health Warning