Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
This website will transition to a NEW 511 site. Start using it NOW & give us feedback.
I-86 in both directions: Road construction, paving operations, roadway reduced to two lanes, follow the signs, speed restrictions in force, width limit in effect.
I-86 in both directions: Road construction.

Between Exit 1: I-84 and Eastbound Coldwater Rest Area (22 to 37 miles west of the American Falls area). Road construction work is in progress. The road is being repaved. The roadway is reduced to two lanes. Follow the signs. Speed restrictions are in force. There is a width limit in effect. Speed limit 70 MPH. Width limit 12'0". Until November 30, 2020 at about 8:00PM MDT.

Web Comment: Eastbound lanes will be closed. Traffic will be moved via crossovers into the westbound lanes creating one eastbound and one westbound lane. DMS signs will be in operation. Traffic control and Contractor: Wadsworth Brothers Const.

Last updated yesterday at 1:21pm MDT
I-86 in both directions: Road construction.
Map of I-86 in both directions: Road construction.
Zoom In
Zoom Out
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Warning Roadwork
Info Info Health Warning Health Warning