Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
US 20: Road construction, work on the shoulder, width limit in effect.
US 20: Road construction.

Between ID 16 and North Linder Road (1 to 3 miles west of the Eagle area). Road construction work is in progress. There is work on the shoulder. There is a width limit in effect. Width limit 12'0". Until November 30, 2020 at about 11:59PM MST.

Web Comment: Expect night work between 1/31/20 and 2/9/20 with traffic periodically reduced to one lane with flagger control. Please drive with caution. 12 width restriction between Black Cat and Linder Road

Last updated yesterday at 6:20pm MST
See Boise area traffic map
US 20: Road construction.
Map of US 20: Road construction.
Zoom In
Zoom Out
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Warning Roadwork Info Info