Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
US 12 in both directions: Paving operations, roadway reduced to one lane, delays, pilot car in operation, look out for flaggers, speed restrictions in force.
US 12 in both directions: Paving operations.

Between The Warm Springs Pack Bridge and Lolo Pass Rest Area (75 to 98 miles east of the Kooskia area). The road is being repaved. The roadway is reduced to one lane. Expect delays. A pilot car is in operation. Look out for flaggers. Speed restrictions are in force. Speed limit 35 MPH. Until October 31, 2018 at about 11:59PM PDT.

Web Comment: Milling and Paving, 30min delays.

Last updated yesterday at 4:05pm PDT
US 12 in both directions: Paving operations.
Map of US 12 in both directions: Paving operations.
Zoom In
Zoom Out
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Warning Roadwork Info Info