Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
ID 24: Road construction, single line traffic - alternating directions, seal coat, loose gravel, look out for flaggers, pilot car in operation, delays, speed restrictions in force, width limit in effect.
ID 24: Road construction.

Between 100 East Road (near Rupert) and 800 East Road (near Minidoka). Road construction work is in progress. Expect single line traffic alternating directions. A seal coat treatment has been applied. Look out for loose gravel on the roadway. Look out for flaggers. A pilot car is in operation. Expect delays. Speed restrictions are in force. There is a width limit in effect. Expect 10 - minute delays. Speed limit 55 MPH. Width limit 12'0". From 6:00AM MDT to 6:00PM MDT on weekdays and Saturday. Until Friday, at about 5:00PM MDT.

Web Comment: Paving Idaho 24 between Rupert and Minidoka (milepost 7 to 18).

Last updated on August 16
ID 24: Road construction.
Map of ID 24: Road construction.
Zoom In
Zoom Out
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Warning Roadwork Info Info