Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
ID 24: Road construction, roadway reduced to one lane, single line traffic - alternating directions, because the road is being repaved, look out for flaggers, pilot car in operation, loose gravel, delays, speed restrictions in force, width limit in effect.
ID 24: Road construction.

Between 100 East Road (near Rupert) and 800 East Road (near Minidoka). Road construction work is in progress. The roadway is reduced to one lane. Expect single line traffic alternating directions because the road is being repaved. Look out for flaggers. A pilot car is in operation. Look out for loose gravel on the roadway. Expect delays. Speed restrictions are in force. There is a width limit in effect. Expect 10 - minute delays. Speed limit 55 MPH. Width limit 12'0". From 6:00AM MDT to 6:00PM MDT on weekdays and Saturday. Until August 31, 2018 at about 5:00PM MDT.

Web Comment: Paving Idaho 24 between Rupert and Minidoka (milepost 7 to 18).

Last updated on June 25
ID 24: Road construction.
Map of ID 24: Road construction.
Zoom In
Zoom Out
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Warning Roadwork Info Info