Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
ID 21: Road construction, bridge maintenance operations, paving operations, roadway reduced to one lane, temporary traffic lights, speed restrictions in force, width limit in effect.
ID 21: Road construction.

Between Archie Creek Road (42 miles north of the Idaho City area) and Warm Springs Creek Airport Road (38 miles south of the Stanley area). Road construction work is in progress. Bridge maintenance work is in progress. The road is being repaved. The roadway is reduced to one lane. Look out for temporary traffic lights. Speed restrictions are in force. There is a width limit in effect. Speed limit 25 MPH. Width limit 11'0". Expect 10 - minute delays. Until August 3, 2018 at about 11:59PM MDT.

Web Comment: Silica fume overlay to resurface the S Fork of the Payette River Bridge (MP 91.02) and Five Mile Creek Bridge (MP 82.75). The bridges will be down to one lane with a temporary light controlling traffic.

Last updated on July 17
ID 21: Road construction.
Map of ID 21: Road construction.
Zoom In
Zoom Out
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Warning Roadwork Info Info