Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
ID 62 in both directions: Road construction, paving operations, work on the shoulder, roadway reduced to one lane.
ID 62 in both directions: Road construction.

Between US 95; Lorahama Street (Craigmont) and Wilson Road South (3 miles west of the Nezperce area). Road construction work is in progress. The road is being repaved. There is work on the shoulder. The roadway is reduced to one lane. From 7:00AM PDT to 8:00PM PDT on weekdays and Saturday. Until Friday, at about 8:00PM PDT.

Web Comment: The project will consist of grinding out areas where the plantmix is distressed and replacing with new plantmix. Tranverse cracks will be routed and filled and the entire road surface will have a smoothness grind overlay. Signs, sign posts and delineators will be places in their existing locations. Pavement markings will be repainted by contractor. Please expect approximately 15 minute delays, going both directions. Commercial vehicle restriction: Width limit of 10ft.

Last updated on June 21
ID 62 in both directions: Road construction.
Map of ID 62 in both directions: Road construction.
Zoom In
Zoom Out
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Warning Roadwork Info Info