Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
US 20 - Critical Reports
Show all Road Reports on US 20
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Critical Reports on US 20
Map of Reports on US 20 Between I-84 and Midland Boulevard (1 mile east of the Caldwell area). Look out for rush hour traffic. Between Eleventh Avenue North Extension (5 miles east of the Caldwell area) and North Fox Run Avenue (near Eagle). Look out for rush hour traffic. Between Cloverdale Road - Joplin Road and I-184 (Boise). Look out for rush hour traffic. Between Blaine Road and County Line Road; Camp Creek Road (11 miles east of the Fairfield area). Road construction work is in progress. Bridge construction work is in progress. There is work on the shoulder. The road is being repaved. The roadway is reduced to one lane. Look out for flaggers. Expect delays. Drive carefully. Speed restrictions are in force. There is a width limit in effect. Consider using an alternate route. Expect 15 - minute delays. Speed limit 35 MPH. Width limit 14'0". From 7:00AM MDT to 7:00PM MDT on weekdays. Until December 15, 2019 at about 7:00PM MDT. Between Hot Springs Landing Road and Station Crossing Road (19 to 20 miles east of the Fairfield area). Road construction work is in progress. Bridge construction work is in progress. There is work on the shoulder. The road is being repaved. The roadway is reduced to one lane. Expect delays. Look out for flaggers. Drive carefully. Speed restrictions are in force. There is a width limit in effect. Consider using an alternate route. Expect 15 - minute delays. Speed limit 35 MPH. Width limit 14'0". From 7:00AM MDT to 7:00PM MDT on weekdays. Until December 15, 2019 at about 7:00PM MDT. Between 2400 North Road (near Butte City) and Brunt Road (24 miles west of the Idaho Falls area). Look out for large animals on the roadway. Be aware of the animal crossing area. Drive with extreme caution. Between Exit 337: Salem Road (near Rexburg) and The Truck Scale Port of Entry (4 miles west of the Ashton area). Look out for construction work. The roadway is reduced to one lane. There is a width limit in effect. Between North River Road and 2050 North Road (1 to 4 miles east of the Ashton area). Major road construction work is in progress. Traffic is heavy. Traffic is backed up. Be aware of narrow lanes because a lane is closed. Speed limit 45 MPH. Width limit 12'0". From 7:00AM MDT to 7:00PM MDT on weekdays. Until November 8, 2019 at about 6:00PM MDT.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Warning Roadwork Info Info