Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
Mountain Passes—North Idaho
Map of North Idaho Between Fiddler's Ridge Loop; Travis Road (Potlatch) and O'Rielly Road (near Onaway). Road construction work is in progress. Bridge construction work is in progress. There is work on the shoulder. Look out for flaggers. There is a width limit in effect. The roadway is reduced to one lane. Width limit 12'0". Expect 5 - minute delays. Until October 30, 2019 at about 5:30PM PDT. Between Washington State Line and US 95. The roadway is reduced to one lane. Look out for flaggers. Drive with extreme caution. From 6:00AM PDT to 2:00PM PDT on Monday, Tuesday, Wednesday and Thursday. For the next two weeks. Between ID 58 and Setters Road (2 to 7 miles north of the Worley area). A lane is closed intermittently. The roadway is reduced to one lane due to bridge construction work. Speed limit 45 MPH. Width limit 14'0". Between US Route 95 Business and Winchester-Culdesac Road (6 to 7 miles north of the Craigmont area). Road construction work is in progress. Drive with extreme caution. Expect delays. Bridge construction work is in progress. There is work on the shoulder. Reduce your speed. The road is rough. Look out for flaggers. Truck speed limit 35 MPH. Speed limit 35 MPH. Width limit 11'0". Until October 31, 2019 at about 11:59PM PDT. Between Exit 67: Mill Street and Lookout Pass (near Mullan). Be aware of narrow lanes due to long term road construction work. A mandatory speed limit is in force. There are temporary lane markings. Speed limit 45 MPH. Width limit 12'0". Until October 27, 2019 at about 5:00PM PDT. Between Exit 17: Mullan Road and Exit 22: ID 97 (2 to 5 miles east of the Coeur d'Alene area). Road construction work is in progress due to bridge construction work. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. Be aware of narrow lanes. Width limit 14'0". Speed limit 45 MPH. Until October 16, 2019 at about 11:59PM PDT. Between Gibbonsville Road and The Montana State Line (30 to 44 miles north of the Salmon area). The road is being repaved. There is work on the shoulder. Until August 30, 2019 at about 10:00PM MDT. Between Alderson Lane and Washington Street - Madison Street (Bonners Ferry). The road is being reconstructed. Width limit 11'0". Until October 1, 2019 at about 5:00PM PDT. Between Garden Gulch Road and Vale Road (6 miles east of the Onaway area). Road construction work is in progress. The road is being repaved. There is work on the shoulder. The roadway is reduced to one lane. Expect delays. Look out for flaggers. There is a width limit in effect. Width limit 12'0". Expect 15 - minute delays. Until September 26, 2019 at about 7:00PM PDT. Between The Washington State Line and Exit 7: ID 41 (near Post Falls). Look out for rush hour traffic. Between County Road 58 and County Road 56 (9 miles north of the Bonners Ferry area). There are temporary lane markings. Between I-90 (Coeur d'Alene) and Lancaster Road (Hayden). Look out for rush hour traffic. Between US 2 and Marion Avenue (near Oldtown). Bridge construction work is in progress. Look out for flaggers. Speed limit 25 MPH. Width limit 11'0". Until September 27, 2019 at about 4:30PM PDT.
US 93: Lost Trail Pass
I-90: Fourth of July Pass
US 95: White Bird Hill
US 12: Lolo Pass
I-90: Lookout Pass
US 95: Lewiston Hill
Google Static Map Image
Mountain Pass Mountain Pass