Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
Cameras—North Idaho
Map of North Idaho Between The Washington State Line (near Post Falls) and Exit 12: US 95 (Coeur d'Alene). There is work on the shoulder. People are working in the median. From 6:00AM PDT to 3:00PM PDT on Monday, Tuesday, Wednesday and Thursday. Until May 2, 2019 at about 3:00PM PDT. Between Exit 48: Airport Road (near Smelterville) and Exit 49: New Street/Kellogg (near Kellogg). The right shoulder is closed. Between Alderson Lane and Washington Street - Madison Street (Bonners Ferry). The road is being reconstructed. Width limit 11'0". Until October 1, 2019 at about 5:00PM PDT. Between S. Tower Creek Road and Hull Creek Road (9 to 24 miles north of the Salmon area). Road maintenance work is in progress. Until April 30, 2019 at about 6:00PM MDT. Between Old Reubens Road and Winchester-Culdesac Road (5 to 7 miles north of the Craigmont area). Road construction work is in progress. Drive with extreme caution. Expect delays. Speed limit 45 MPH. Until September 30, 2019 at about 6:00PM PDT. Between White Bird Creek Bridge (near White Bird) and Lake Road (6 miles north of the White Bird area). The roadway is reduced to two lanes. There is work on the shoulder. Until May 1, 2019 at about 5:00PM PDT. Between Exit 7: ID 41 (Post Falls) and Exit 11 (Coeur d'Alene). Bridge construction work is in progress. Look out for a new road construction layout. Be aware of narrow lanes. Truck speed limit 55 MPH. Width limit 11'0". Until June 28, 2019 at about 11:59PM PDT. Between County Road 58 and County Road 56 (9 miles north of the Bonners Ferry area). There are temporary lane markings. Between Exit 67: Mill Street and Exit 69: East Mullan (near Mullan). The right lane is closed because of utility work. Width limit 16'0". From 6:00AM PDT to 6:00PM PDT on weekdays. Until April 26, 2019 at about 5:00PM PDT. Between Exit 5: Interstate 90 Business and Exit 7: ID 41 (Post Falls). Look out for construction work. The right lane is closed. Truck speed limit 55 MPH. Width limit 13'0". Until April 29, 2019 at about 5:30AM PDT. Between Exit 11 (Coeur d'Alene) and Exit 7: ID 41 (Post Falls). Bridge construction work is in progress. Look out for a new road construction layout. Be aware of narrow lanes. Truck speed limit 55 MPH. Width limit 18'0". Until June 28, 2019 at about 11:59PM PDT. Between Suttler Creek Road and Swan Creek Road (8 to 9 miles east of the Kooskia area). Look out for a surface water hazard. Drive with extreme caution. Between US 2 and Marion Avenue (near Oldtown). Bridge construction work is in progress. Width limit 14'0". Speed limit 25 MPH. Until September 27, 2019 at about 4:30PM PDT.
US 95: Lewiston Hill
ID 11: Top of Greer Grade
US 95: Kathleen Ave
ID 200: East Sunnyside
ID 41: Old Town
US 12: Upper Lochsa
ID 8: Farm
I-90: Wallace
ID 6: Mt. Margaret
US 2: Wrenco Loop
US 95: Lake Creek
US 95: Shirrod Hill
ID 8: US-95 Jct
US 95: Wyoming
US 95: Palouse River
US 12: Kamiah
US 95: Winchester
I-90: Lookout Pass
US 95: Granite Hill
I-90: Railroad Bridge
US 12: Lolo Pass
ID 8: Line
I-90: Cataldo
US 95: Ironwood
I-90: Veterans Memorial Bridge
US 95: Marsh Hill
ID 3: Shoshone County Line
US 12: Cottonwood Creek
US 95: Idaho County Line
ID 6: Harvard Hill
I-90: Northwest Blvd
US 95: Five Mile Hill
US 95: Hayden
US 93: Lost Trail Pass
US 95: Hanley
US 95: Prairie
US 12: Alpowa Summit WA
US 95: Concrete
US 95: Whitebird Hill
ID 3: Deary
US 95: Sandpoint
I-90: Lookout Pass MT
US 95: Appleway
I-90: 4th of July Summit
ID 3: Black Lake
I-90: Liberty Lake WA
US 95: Frei Hill
US 95: SH-8 Junction
US 95: D Street
ID 14: Elk City
US 95: Junction I-90
ID 41: Seasons
ID 5: Parker Pass
ID 11: Grangemont
ID 57: Priest Lake
Google Static Map Image
Camera Camera