Truck Restrictions—North Idaho
Map of North Idaho Between Lakeshore Drive (1 mile south of the Sandpoint area) and Sandcreek Bypass Bridge (near Sandpoint). Road construction work is in progress. The road is being repaved. Be aware of narrow lanes. Speed restrictions are in force. There is a width limit in effect. Speed limit 35 MPH. Width limit 12'0". Until November 30. Between Exit 17: Mullan Road and Exit 28: Crossroad (3 to 6 miles east of the Coeur d'Alene area). Bridge construction work is in progress. Road construction work is in progress. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. Speed limit 55 MPH. Width limit 14'0". Until November 15. Between US Route 95 Business and Frontage Road (near Culdesac). Road construction work is in progress. There is work on the shoulder. The roadway is reduced to one lane. Look out for flaggers. Expect 15 - minute delays. Until October 19. Between ID 54 (Spirit Lake) and US 2 (near Oldtown). Look out for construction work. There is work on the shoulder. Traffic is stop and go. A lane is closed intermittently. Look out for flaggers. A pilot car is in operation. Speed restrictions are in force. Speed limit 45 MPH. Expect 15 - minute delays. Between ID 3 (11 miles east of Lewiston) and Bobbit Bench Road (4 miles west of the Orofino area). Road construction work is in progress. The roadway is reduced to one lane. Look out for flaggers. Drive with extreme caution. Expect 30 - minute delays. Speed limit 45 MPH. From 6:00AM PDT to 6:00PM PDT on weekdays and Saturdays. Until November 17. Between Sky Line Drive and Martin Road (4 to 8 miles south of the Tensed area). Road construction work is in progress. Expect delays. Look out for flaggers. Speed limit 35 MPH. Width limit 11'0". Until October 31. Between ID 53 (Rathdrum) and ID 54 (Spirit Lake). Road construction work is in progress. There is work on the shoulder. Traffic is stop and go. A lane is closed intermittently. A pilot car is in operation. Look out for flaggers. Speed restrictions are in force. Speed limit 45 MPH. Expect 15 - minute delays.
US 95: Road construction, paving operations, narrow lanes, speed restrictions in force, width limit in effect.
I-90 in both directions: Bridge construction, road construction, roadway reduced to one lane, speed restrictions in force, width limit in effect.
I-90 eastbound: Ramp restrictions in force, gross weight limit in effect.
ID 5 in both directions: Construction work, single line traffic - alternating directions.
US 95 in both directions: Road construction, delays, look out for flaggers.
I-90: Long term road construction.
ID 97 in both directions: Length limit in effect.
Huetter Weigh Station
ID 3: Kendrick
Bonners Ferry Weigh Station
I-90: Lookout Pass
US 95: Lewiston Hill
Haugan Weigh Station
Lewiston Weigh Station
US 95: Bonners Ferry
US 95: Whitebird Hill