Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
Truck Restrictions
US 20 Whole Road 2 reports
Parma to Boise No reports
Mountain Home to Arco No reports
Arco to Idaho Falls No reports
Idaho Falls to Montana 2 reports
Truck Restrictions on US 20
Map of Reports on US 20 Between 2200 North Road and US 93 (near Arco). There is work on the shoulder. Until May 24. Between The South Branch Harrison Canal Bridge and Exit 322: US Route 20 Business (near Rigby). Look out for a surface water hazard. Reduce your speed. Between Exit 320: US Route 20 Business and Ellis Road (near Rigby). Road construction work is in progress. There is work on the shoulder. From 7:00AM MDT to 7:00PM MDT on weekdays. Until May 31. Between 4300 West Road (3 miles west of the Rexburg area) and Exit 332: South Rexburg (Rexburg). Road construction work is in progress. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. Look out for flaggers. Speed limit 55 MPH. Width limit 14'0". Until June 7. Between Sawtelle Road (near Island Park) and The Montana State Line (3 miles east of the Island Park area). Road construction work is in progress. Look out for mobile maintenance operations. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. A pilot car is in operation. Look out for flaggers. Variable message signs are operating. Speed limit 55 MPH. Width limit 14'0". From 7:00AM MDT to 7:00PM MDT daily. Until May 24.
US 20 in both directions: Road construction, roadway reduced to one lane, speed restrictions in force, width limit in effect, look out for flaggers.
US 20 in both directions: Road construction, mobile maintenance operations, roadway reduced to one lane, speed restrictions in force, width limit in effect, pilot car in operation, look out for flaggers, variable message signs operating.
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup Truck Ramp Truck Ramp