Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
Truck Restrictions
US 95 Whole Road 4 reports
Oregon to Payette No reports
Payette to New Meadows 1 report
New Meadows to Lewiston 2 reports
Lewiston to Coeur d'Alene 1 report
Coeur d'Alene to Canada 1 report
Truck Restrictions on US 95
Map of Reports on US 95 Between Sage Creek Road (near Midvale) and Haller Avenue (Cambridge). Look out for mobile maintenance operations. Look out for a slow moving maintenance vehicle. There is work on the shoulder. Drive carefully. From 5:00AM MDT to 2:00PM MDT on Tuesday and Wednesday. Until today at about 2:00PM MDT. Between Middle Fork Road (2 miles south of the Council area) and Colt Street (New Meadows). Road construction work is in progress. The roadway is reduced to one lane. Look out for flaggers. Expect delays. A pilot car is in operation. Expect 15 - minute delays. From 7:00AM MDT to 6:00PM MDT daily. Until September 30. Between County Road (14 miles north of the New Meadows area) and Pinehurst Road (11 miles south of the Riggins area). Road construction work is in progress. There is work on the shoulder. The roadway is reduced to one lane. Look out for flaggers. Expect delays. There is a width limit in effect. Speed restrictions are in force. Width limit 14'0". Expect 5 - minute delays. Speed limit 35 MPH. From 7:00AM MDT to 7:00PM MDT on weekdays. Until August 13. Between Hawley Road and Smith Road (2 to 3 miles north of the Moscow area). Road construction work is in progress. The road is being repaved. There is work on the shoulder. Short delays are possible. Look out for flaggers. Until September 22. Between Johnston Road and Seltice Avenue (near Plummer). Bridge construction work is in progress. Speed limit 20 MPH. Width limit 14'0". Until September 19. Between East Remington Road and Granite-Kelso Cut-Off Road (near Athol). Major road construction work is in progress. Look out for a new road construction layout. Short delays are possible due to stopped traffic. Look out for flaggers. Speed restrictions are in force. Truck speed limit 45 MPH. Between Grove Avenue and Granite-Kelso Cut-Off Road (1 mile north of the Athol area). The roadway is reduced to one lane because of major road construction work. Look out for trucks entering the roadway. Speed restrictions are in force. Speed limit 45 MPH. Between Washington Street - Madison Street and Comance Street (Bonners Ferry). Bridge maintenance work is in progress. Look out for flaggers. The roadway is reduced to two lanes. Speed limit 25 MPH. Width limit 10'0". Until September 2.
US 95: Road construction, work on the shoulder, roadway reduced to one lane, look out for flaggers, delays, width limit in effect, speed restrictions in force.
US 95 in both directions: Bridge construction, roadway reduced to one lane, temporary traffic lights, truck restrictions in force.
US 95: Bridge construction.
US 95 in both directions: Bridge maintenance operations, look out for flaggers, roadway reduced to two lanes.
US 95: Lewiston Hill
US 95: Whitebird Hill
Bonners Ferry Weigh Station
Lewiston Weigh Station
Marsing Weigh Station
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup
Truck Ramp Truck Ramp Weigh Station Weigh Stations