Truck Restrictions on I-84
Map of Reports on I-84 Between The Oregon State Line (near Fruitland) and Exit 17: Sand Hollow (12 miles west of the Caldwell exit). Road construction work is in progress. There is work on the shoulder. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. Speed limit 65 MPH. Width limit 14'0". Until October 31. Between Exit 29: US 20; Franklin Road and Exit 38: I-84B (near Nampa). Road construction work is in progress. Bridge construction work is in progress. The roadway is reduced to one lane. There is a width limit in effect. A detour is in operation. Speed restrictions are in force. Speed limit 55 MPH. Width limit 10'0". Until October 3. Between Exit 29: US 20; Franklin Road and Exit 38: I-84B (near Nampa). Road construction work is in progress. Bridge construction work is in progress. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. A detour is in operation. Speed limit 55 MPH. Width limit 18'0". Until October 3. Between Exit 38: I-84B (Meridian) and I-184 (Boise). Road construction work is in progress. Bridge construction work is in progress. There is work on the shoulder. The roadway is reduced to two lanes. Speed restrictions are in force. Speed limit 55 MPH. Until October 31, 2015. Between ID 55 (Meridian) and I-184 (Boise). Traffic is slow. Between Exit 52: Orchard Street and Exit 57: Gowen Road (near Boise). Road construction work is in progress. Bridge construction work is in progress. The roadway is reduced to one lane. There is a width limit in effect. There is work on the shoulder. People are working in the median. Speed restrictions are in force. Speed limit 55 MPH. Width limit 14'0". From 8:00PM MDT to 5:00AM MDT daily. Until December 1, 2015. Between Exit 54: US 20; Broadway Avenue and Exit 60: The Isaacs Canyon Interchange (near Boise). Road construction work is in progress. Bridge construction work is in progress. There is work on the shoulder. People are working in the median. The roadway is reduced to one lane. Speed restrictions are in force. Speed limit 55 MPH. Until October 1, 2015. Between Exit 137 and Exit 141: I-84B; US 26 (near Bliss). Bridge maintenance work is in progress. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. Speed limit 65 MPH. Width limit 13'0". Until August 29.
I-84: Road construction, work on the shoulder, roadway reduced to one lane, speed restrictions in force, width limit in effect.
I-84 westbound: Road construction, bridge construction, roadway reduced to one lane, width limit in effect, detour in operation, speed restrictions in force.
I-84 eastbound: Road construction, bridge construction, roadway reduced to one lane, speed restrictions in force, width limit in effect, detour in operation.
I-84: Road construction, bridge construction, roadway reduced to one lane, width limit in effect, work on the shoulder, work in the median, speed restrictions in force.
I-84 in both directions: Road closed intermittently, truck restrictions in force, roadway reduced to one lane, night time construction work, follow the detour signs.
I-84: Bridge maintenance operations, traffic restrictions in force, on, overpass, roadway reduced to one lane, width limit in effect.
I-84 in both directions: Bridge maintenance operations, roadway reduced to one lane, speed restrictions in force, width limit in effect.