Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
Truck Restrictions
I-84 Whole Road 8 reports
Oregon to Boise No reports
Boise to Twin Falls 4 reports
Twin Falls to I-86 Junction 4 reports
I-86 Junction to Utah No reports
Truck Restrictions on I-84
Map of Reports on I-84 Between Exit 46: ID 55; Eagle Road and Exit 52: Orchard Street (near Boise). Road construction work is in progress. The roadway is reduced to two lanes. Speed restrictions are in force. Speed limit 55 MPH. From 10:00PM MDT to 7:00AM MDT on weekdays and Saturday. Until October 27, 2017 at about 5:00AM MDT. Between Exit 64: Black's Creek Road and Exit 71: Mayfield Road (5 to 7 miles east of the Boise area). Road maintenance work is in progress. The roadway is reduced to one lane. Until tomorrow at about 5:00AM MDT. Between Exit 74: Simco Road and Exit 95: US 20; ID 51 (2 to 3 miles west of the Mountain Home area). Road construction work is in progress. The right lane is closed. Speed restrictions are in force. Speed limit 65 MPH. Until September 15, 2017 at about 6:00PM MDT. Between Exit 120: Bannock Avenue and Eastbound Bliss Rest Area (7 miles east of the Glenns Ferry area). Road maintenance work is in progress. There are alternating lane closures. Speed restrictions are in force. There is a width limit in effect. Speed limit 70 MPH. Width limit 12'0". Until September 29, 2017 at about 5:00PM MDT. Between Exit 125: 18th East Street and Exit 129: Parks Loop Road (5 to 6 miles east of the Glenns Ferry area). Bridge inspection work is in progress. The roadway is reduced to one lane. There are alternating lane closures. There is a width limit in effect. Width limit 16'0". From 8:00AM MDT to 5:30PM MDT on Monday, Tuesday, Wednesday and Thursday. Until tomorrow at about 5:30PM MDT. Between Exit 137: I-84B and Exit 147: 2350 South Road (near Bliss). There is work on the shoulder. Look out for construction work. Until September 1, 2017 at about 5:00PM MDT. Between Exit 141: I-84B and Exit 147: 2350 South Road (4 to 5 miles east of the Bliss area). The left lane is closed because of bridge maintenance work. The road is being repaved. There is a width limit in effect. Width limit 14'0". Until September 15, 2017 at about 5:00PM MDT. Between Exit 157: ID 46 (near Wendell) and Exit 168: Jerome/Lincoln Street (near Jerome). The road is being repaved. The roadway is reduced to two lanes. Speed restrictions are in force. There is a width limit in effect. The exit ramp is closed. The entrance ramp is closed. Speed limit 70 MPH. Width limit 14'0". Until October 20, 2017 at about 5:00PM MDT. Between Exit 173: US 93 (9 miles west of the Hazelton area) and Exit 201: ID 25; Kasota Road (4 miles east of the Hazelton area). Road construction work is in progress. The roadway is reduced to two lanes. The road is being repaved. There is work on the shoulder. Speed restrictions are in force. There is a width limit in effect. Speed limit 70 MPH. Width limit 12'0". Until November 17, 2017 at about 8:00PM MDT. Between Exit 194: ID 25; Ridgeway Road (4 miles east of the Hazelton area) and Exit 208: ID 27 (6 miles west of the Burley area). The roadway is reduced to two lanes because the road is being repaved. People are working in the median. Speed restrictions are in force. There is a width limit in effect. Ramp restrictions are in force. Speed limit 65 MPH. Width limit 12'0". Until September 1, 2017 at about 6:00PM MDT. Between Exit 222: I-86 and Exit 216: ID 25; ID 77 (6 to 7 miles east of the Heyburn area). Bridge maintenance work is in progress. The bridge is closed. There is a width limit in effect. Speed restrictions are in force. Follow the local detour. Speed limit 65 MPH. Width limit 15'0". Until Friday, at about 5:00PM MDT.
I-84: Road maintenance operations, alternating lane closures, speed restrictions in force, width limit in effect.
I-84 in both directions: Bridge inspection work is in progress, roadway reduced to one lane, alternating lane closures, width limit in effect.
I-84 in both directions: Left lane closed, because of bridge maintenance work, paving operations, width limit in effect.
I-84: Paving operations, roadway reduced to two lanes, speed restrictions in force, width limit in effect, exit ramp closed, entrance ramp closed.
I-84 in both directions: Road construction, roadway reduced to two lanes, paving operations, work on the shoulder, speed restrictions in force, width limit in effect.
I-84: Roadway reduced to two lanes, because the road is being repaved, work in the median, speed restrictions in force, width limit in effect, ramp restrictions in force.
I-84 in both directions: Bridge construction, roadway reduced to two lanes, width limit in effect, speed restrictions in force.
I-84 westbound: Bridge maintenance operations, bridge closed, width limit in effect, speed restrictions in force, follow local detour.
East Boise Weigh Station
Cotterell Weigh Station
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup
Truck Ramp Truck Ramp Weigh Station Weigh Stations