I-84: Boise to Twin Falls
I-84: Road construction, bridge construction, work on the shoulder, work in the median, roadway reduced to one lane, speed restrictions in force, width limit in effect, detour in operation.
Between Exit 54: US 20; Broadway Avenue and Exit 60: The Isaacs Canyon Interchange (near Boise). Road construction work is in progress. Bridge construction work is in progress. There is work on the shoulder. People are working in the median. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. A detour is in operation. Speed limit 55 MPH . Width limit 12'0". Until October 1, 2015.

Comment: I-84 Loads over 12’ wide (westbound) are being detoured between exits 57 and 59 via Federal Way. I-84 loads over 12’ wide (eastbound) are being detoured off and on at the Gowen Road IC Ramps. This restriction will be in place until late October 2014.
Last updated yesterday at 3:49pm MDT
I-84: Bridge maintenance operations, traffic restrictions in force, on, overpass, roadway reduced to one lane, width limit in effect.
At Exit 125: 18th East Street (3 miles east of the Glenns Ferry area). Bridge maintenance work is in progress. Traffic restrictions are in force. On. Overpass. The roadway is reduced to one lane. There is a width limit in effect. Width limit 13'0". Until August 29.

Comment: Bridge resurfacing project affecting local roadway at Paradise Valley/Exit 125. No restrictions on Interstate 84. Contractor: L&J Construction, 406-599-7776
Last updated on July 22
I-84 in both directions: Bridge maintenance operations, roadway reduced to one lane, speed restrictions in force, width limit in effect.
Between Exit 137 and Exit 141: I-84B; US 26 (near Bliss). Bridge maintenance work is in progress. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. Speed limit 65 MPH . Width limit 13'0". Until August 29.

Comment: Bridge resurfacing project on Union Pacific Railroad overpass west of Exit 141. Watch for trucks entering and exiting work zone. Wide loads must use I-84 business loop between Exits 137 and 141 through Bliss. Contractor: L&J Construction, 406-599-7776
Last updated on July 22
Switch to Winter Driving Conditions
Switch to Road Reports
Restrictions on I-84: Boise to Twin Falls
Map of Reports on I-84 Between Exit 52: Orchard Street and Exit 57: Gowen Road (near Boise). Road construction work is in progress. Bridge construction work is in progress. The roadway is reduced to one lane. Speed restrictions are in force. Speed limit 55 MPH. From 8:00PM MDT to 5:00AM MDT daily. Until December 1, 2015. Between Exit 54: US 20; Broadway Avenue and Exit 60: The Isaacs Canyon Interchange (near Boise). Road construction work is in progress. Bridge construction work is in progress. There is work on the shoulder. People are working in the median. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. A detour is in operation. Speed limit 55 MPH. Width limit 12'0". Until October 1, 2015. Between Exit 137 and Exit 141: I-84B; US 26 (near Bliss). Bridge maintenance work is in progress. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. Speed limit 65 MPH. Width limit 13'0". Until August 29.
I-84: Road construction, bridge construction, work on the shoulder, work in the median, roadway reduced to one lane, speed restrictions in force, width limit in effect, detour in operation.
I-84: Bridge maintenance operations, traffic restrictions in force, on, overpass, roadway reduced to one lane, width limit in effect.
I-84 in both directions: Bridge maintenance operations, roadway reduced to one lane, speed restrictions in force, width limit in effect.