Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
I-84: Oregon to Boise
I-84: Road construction, work on the shoulder, roadway reduced to one lane, speed restrictions in force, width limit in effect.
Between The Oregon State Line (near Fruitland) and Exit 17: Sand Hollow (12 miles west of the Caldwell exit). Road construction work is in progress. There is work on the shoulder. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. Speed limit 65 MPH . Width limit 14'0". Until October 31.

Comment: The normal operating hours for this project will be Monday through Friday, 6 AM to 8 PM from June 16th until October 31, 2014. Traffic will be placed into a two-way, opposing single lane configuration. Crossovers will be located at MP0.25, either side of IC 03, and west of IC 13. The Westbound on and off ramps at Interchange 09, (US30) will be closed until early September. Motorists are advised to use alternate routes at IC 03 or at IC 13. Motorists are advised to use Exit 3, US95 and proceed north to US30. A signed detour will be posted to direct traffic to east to IC 13, where they will be directed over to the westbound direction.
Last updated on August 18
I-84: Road construction, bridge construction, roadway reduced to one lane, width limit in effect.
Between Exit 29: US 20; Franklin Road and Exit 38: I-84B (near Nampa). Road construction work is in progress. Bridge construction work is in progress. The roadway is reduced to one lane. There is a width limit in effect. Speed limit 55 MPH . Until October 3.

Comment: Width limit in effect ONLY at night, 14' (9pm to 5am). no restruction during the day, (5am to 9pm). Traffic will be open in both lanes in each direction at the normal speed between 5:00 am and 9:00 pm. Traffic may be reduced to ONE lane in each direction between 9:00 pm and 5:00 am for night work
Last updated on August 19
Switch to Winter Driving Conditions
Switch to Road Reports
Restrictions on I-84: Oregon to Boise
Map of Reports on I-84 Between The Oregon State Line (near Fruitland) and Exit 17: Sand Hollow (12 miles west of the Caldwell exit). Road construction work is in progress. There is work on the shoulder. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. Speed limit 65 MPH. Width limit 14'0". Until October 31. Between Exit 29: US 20; Franklin Road and Exit 38: I-84B (near Nampa). Road construction work is in progress. Bridge construction work is in progress. The roadway is reduced to one lane. There is a width limit in effect. Speed limit 55 MPH. Until October 3. Between Exit 38: I-84B and Exit 46: Eagle Road (near Meridian). Road construction work is in progress. Bridge construction work is in progress. The roadway is reduced to two lanes. The left lane is closed. Speed restrictions are in force. Speed limit 55 MPH. Until October 31, 2015. Between Exit 44: ID 69 (Meridian) and I-184 (Boise). Road construction work is in progress. People are working in the median. The roadway is reduced to two lanes. Speed restrictions are in force. Speed limit 55 MPH. Until August 30.
I-84: Road construction, work on the shoulder, roadway reduced to one lane, speed restrictions in force, width limit in effect.
I-84: Road construction, bridge construction, roadway reduced to one lane, width limit in effect.
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup
Truck Ramp Truck Ramp Weigh Station Weigh Stations