Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
US 95: Lewiston to Coeur d'Alene
US 95 in both directions: Road construction, delays, look out for flaggers.
Between Sky Line Drive and Martin Road (4 to 8 miles south of the Tensed area). Road construction work is in progress. Expect delays. Look out for flaggers. Speed limit 35 MPH . Width limit 11'0". Until October 31.
Last updated yesterday at 2:16pm PDT
Switch to Winter Driving Conditions
Switch to Road Reports
Restrictions on US 95: Lewiston to Coeur d'Alene
Map of Reports on US 95 Between Sky Line Drive and Martin Road (4 to 8 miles south of the Tensed area). Road construction work is in progress. Expect delays. Look out for flaggers. Speed limit 35 MPH. Width limit 11'0". Until October 31. Between A Street (1 mile north of the Plummer area) and First Street (near Worley). The road is being repaved. The roadway is reduced to one lane. Expect delays. A pilot car is in operation. Speed limit 45 MPH. Until September 21.
US 95 in both directions: Road construction, delays, look out for flaggers.
US 95: Lewiston Hill
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup
Truck Ramp Truck Ramp Weigh Station Weigh Stations