Restrictions on I-84: Boise to Twin Falls
I-84: Boise to Twin Falls
Between Exit 52: Orchard Street and Exit 57: Gowen Road (near Boise). Road construction work is in progress. Bridge construction work is in progress. The roadway is reduced to one lane. There is a width limit in effect. There is work on the shoulder. People are working in the median. Speed restrictions are in force. Speed limit 55 MPH . Width limit 14'0". From 8:00PM MDT to 5:00AM MDT daily. Until December 1, 2015.

Comment: 14’ width restriction on Broadway WB onramp. Mainline lanes have no width restriction. Please call Dana at 830-3617 regarding wider loads.
Last updated yesterday at 8:25am MDT
At ID 21 (Boise). The road is closed intermittently. Truck restrictions are in force. The roadway is reduced to one lane. Night time construction work is in progress. Follow the detour signs. Speed limit 55 MPH . Width limit 12'0". From 7:00PM MDT to 10:00PM MDT daily. Until September 1.

Comment: I-84 Loads over 12’ wide are being detoured between exits 57 and 59 via Federal Way and Eisenman Roads. This restriction will be in place until late October 2014. Rock blasting will be happening between the hours of 7pm to dusk on various nights for the next 3 months. Detour will be in place when blasting near I-84. Eastbound off and on-ramps, and Gowen Road between I-84 and Eisenman Road will be intermittently closed the nights for blasting. Eastbound ramp traffic will be detoured to the Eisenman Interchange (exit 60).
Last updated on July 10
At Exit 125: 18th East Street (3 miles east of the Glenns Ferry area). Bridge maintenance work is in progress. Traffic restrictions are in force. On. Overpass. The roadway is reduced to one lane. There is a width limit in effect. Width limit 13'0". Until August 29.

Comment: Bridge resurfacing project affecting local roadway at Paradise Valley/Exit 125. No restrictions on Interstate 84. Contractor: L&J Construction, 406-599-7776
Last updated on July 22
Between Exit 137 and Exit 141: I-84B; US 26 (near Bliss). Bridge maintenance work is in progress. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. Speed limit 65 MPH . Width limit 13'0". Until August 29.

Comment: Bridge resurfacing project on Union Pacific Railroad overpass west of Exit 141. Watch for trucks entering and exiting work zone. Wide loads must use I-84 business loop between Exits 137 and 141 through Bliss. Contractor: L&J Construction, 406-599-7776