Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
Restrictions on I-84: Boise to Twin Falls
I-84: Boise to Twin Falls
Between Exit 52: Orchard Street and Exit 57: Gowen Road (near Boise). Road construction work is in progress. Bridge construction work is in progress. The roadway is reduced to one lane. There is a width limit in effect. There is work on the shoulder. People are working in the median. Speed restrictions are in force. Speed limit 55 MPH . Width limit 14'0". From 8:00PM MDT to 5:00AM MDT daily. Until December 1, 2015.

Comment: 14’ width restriction on Broadway WB onramp. Mainline lanes have no width restriction. Please call Dana at 830-3617 regarding wider loads.
Last updated on July 24
Between The Boise Port of Entry and Exit 74: Simco Road (8 to 12 miles east of the Boise area). Road construction work is in progress. The road is being repaved. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. Speed limit 65 MPH . Width limit 16'0". Until August 15.

Comment: Work is to remove and replace asphalt pavement over a 770 foot section near the Indian Creek Bridge. Work is being done using crossovers with two way two lane traffic for approximately one mile in the vicinity of Mayfield. The westbound Mayfield exit to Stage Stop is open. The westbound onramp from Mayfield is closed. Traffic will need to take I-84 eastbound to Simco Road and turn around to get back on the interstate to use the crossover.
Last updated on July 30
At Exit 125: 18th East Street (3 miles east of the Glenns Ferry area). Bridge maintenance work is in progress. Traffic restrictions are in force. On. Overpass. The roadway is reduced to one lane. There is a width limit in effect. Width limit 13'0". Until August 29.

Comment: Bridge resurfacing project affecting local roadway at Paradise Valley/Exit 125. No restrictions on Interstate 84. Contractor: L&J Construction, 406-599-7776
Last updated on July 22
Between Exit 137 and Exit 141: I-84B; US 26 (near Bliss). Bridge maintenance work is in progress. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. Speed limit 65 MPH . Width limit 13'0". Until August 29.

Comment: Bridge resurfacing project on Union Pacific Railroad overpass west of Exit 141. Watch for trucks entering and exiting work zone. Wide loads must use I-84 business loop between Exits 137 and 141 through Bliss. Contractor: L&J Construction, 406-599-7776
Last updated on July 22