Between Hatwai Bypass Road (1 mile south of the Lewiston area) and 48th Street North (near Lewiston). Road construction work is in progress. Northbound traffic. The left lane is closed. There is a width limit in effect. Width limit 17'0". For a month.

Comment: A Weigh-in-Motion system upgrade is in progress and will not impact traffic this weekend. Beginning Monday June 17th through Monday July 8th the Northbound left lane will be closed. Additional closures can be expected in both the north and/or south bound travel lanes thru mid-August as construction on the system is performed. Updates will be made as necessary.
Last updated yesterday at 9:15am PDT
Switch to Winter Driving Conditions
Switch to Road Reports
Restrictions on US 95: New Meadows to Lewiston
Map of Reports on US 95 Between Smokey Boulder Road (13 miles north of the New Meadows area) and Pinehurst Road (11 miles south of the Riggins area). Road maintenance work is in progress. The roadway is reduced to one lane. Look out for flaggers. Short delays are possible. From 8:30AM MDT to 4:00PM MDT on Monday, Tuesday, Wednesday and Thursday. Until today at about 4:00PM MDT. Between Cash Lane (near Grangeville) and Third Avenue (near Craigmont). Road construction work is in progress. The road is being repaved. The roadway is reduced to one lane. Look out for flaggers. Expect 15 - minute delays. Until September 1. Between Hatwai Bypass Road (1 mile south of the Lewiston area) and 48th Street North (near Lewiston). Road construction work is in progress. Northbound traffic. The left lane is closed. There is a width limit in effect. Width limit 17'0". For a month.
US 95 northbound: Road construction, northbound traffic, left lane closed, width limit in effect.