Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
I-15: Utah to Pocatello
I-15 in both directions: Roadway reduced to one lane, blasting, road construction, consider using an alternate route, pilot car in operation, delays, width limit in effect.
Between The Inkom Port of Entry and Exit 69: Clark Street (1 mile south of the Pocatello area). The roadway is reduced to one lane. Blasting is in progress. Road construction work is in progress. Consider using an alternate route. A pilot car is in operation. Expect delays. There is a width limit in effect. Expect 5 - minute delays.. Width limit 16'0". From 7:00AM MDT to 7:00PM MDT on weekdays. Until December 15.

Comment: This project on I-15 is between milepost 62, near Blackrock, and milepost 67, South 5th Interchange. Lane reduction and width limit in effect 24 hours a day, seven days a week. Loads over 16' may be accommodated with 24 hours notice by calling Scott Redding at (208) 201-3337. Look for occasional rolling roadblocks on the interstate due to rock removal. Use caution around crews and equipment.
Last updated on July 1
Switch to Winter Driving Conditions
Switch to Road Reports
Restrictions on I-15: Utah to Pocatello
Map of Reports on I-15 Between Exit 17: ID 36; State Highway 36 (2 miles north of the Malad City area) and Exit 31: ID 40; Downey Road (11 miles south of the Arimo area). The roadway is reduced to one lane. There is work on the shoulder. From 7:00AM MDT to 5:00PM MDT on weekdays. Until September 16. Between Exit 17: ID 36; State Highway 36 (2 miles north of the Malad City area) and Exit 31: ID 40; Downey Road (11 miles south of the Arimo area). The roadway is reduced to one lane. There is work on the shoulder. From 7:00AM MDT to 5:00PM MDT on weekdays. Until September 16. Between The Inkom Port of Entry and Exit 69: Clark Street (1 mile south of the Pocatello area). The roadway is reduced to one lane. Blasting is in progress. Road construction work is in progress. Consider using an alternate route. A pilot car is in operation. Expect delays. There is a width limit in effect. Expect 5 - minute delays. Width limit 16'0". From 7:00AM MDT to 7:00PM MDT on weekdays. Until December 15.
I-15 in both directions: Roadway reduced to one lane, blasting, road construction, consider using an alternate route, pilot car in operation, delays, width limit in effect.
Inkom Weigh Station
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup
Truck Ramp Truck Ramp Weigh Station Weigh Stations