Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
US 30: McCammon to Wyoming
US 30: Roadway reduced to one lane, road construction, paving operations, mobile maintenance operations, speed restrictions in force, width limit in effect, look out for flaggers.
Between Jefferson Street (near Montpelier) and Dingle Road - Keetch Road (3 miles east of the Montpelier area). The roadway is reduced to one lane. Road construction work is in progress. The road is being repaved. Look out for mobile maintenance operations. Speed restrictions are in force. There is a width limit in effect. Look out for flaggers. Speed limit 55 MPH . Width limit 17'0". From 7:00AM MDT to 7:00PM MDT daily. Until September 13.

Comment: This Paving project is on US-30 between milepost 435, near Jefferson Street, Montpelier, and milepost 438, near Dingle road. For wide loads, please contact Mike Stoddart, at, 208-201-3323
Last updated yesterday at 9:54am MDT
Switch to Winter Driving Conditions
Switch to Road Reports
Restrictions on US 30: McCammon to Wyoming
Map of Reports on US 30 Between Jefferson Street (near Montpelier) and Dingle Road - Keetch Road (3 miles east of the Montpelier area). The roadway is reduced to one lane. Road construction work is in progress. The road is being repaved. Look out for mobile maintenance operations. Speed restrictions are in force. There is a width limit in effect. Look out for flaggers. Speed limit 55 MPH. Width limit 17'0". From 7:00AM MDT to 7:00PM MDT daily. Until September 13.
US 30: Roadway reduced to one lane, road construction, paving operations, mobile maintenance operations, speed restrictions in force, width limit in effect, look out for flaggers.
US 30: Fish Creek
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup
Truck Ramp Truck Ramp Weigh Station Weigh Stations