Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
US 95: Lewiston to Coeur d'Alene
US 95: Bridge construction.
Between Johnston Road and Seltice Avenue (near Plummer). Bridge construction work is in progress. Speed limit 20 MPH . Width limit 14'0". Until Friday, at about 7:00PM PDT.

Comment: Plummer Creek Culvert at MP 394.44 has been replaced and US-95 will be open to two lane traffic on Thursday 8/14/14. The 20 mile per our speed limit will remain in effect through this zone until paving is completed on Monday 8/18/14 at which time the speed limit will be returned to 45 mph. Excavation on the other Plummer Creek Culvert at MP 395.05 will begin on Thursday 8/14/14. Traffic will be reduced to one lane through this zone at that time and the speed limit will be reduced to 20 mph. A 14' width restriction will be in effect through this MP 395.05 zone during construction.
Last updated on August 13
Switch to Winter Driving Conditions
Switch to Road Reports
Restrictions on US 95: Lewiston to Coeur d'Alene
Map of Reports on US 95 Between Hawley Road and Smith Road (2 to 3 miles north of the Moscow area). Road construction work is in progress. Drive with extreme caution. There is work on the shoulder. Until September 22. Between Johnston Road and Seltice Avenue (near Plummer). Bridge construction work is in progress. Speed limit 20 MPH. Width limit 14'0". Until Friday, at about 7:00PM PDT.
US 95: Bridge construction.
US 95: Lewiston Hill
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup
Truck Ramp Truck Ramp Weigh Station Weigh Stations