Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
US 20: Idaho Falls to Montana
US 20 in both directions: Bridge construction, lane closed.
Between Burton Road and ID 33 (near Rexburg). Bridge construction work is in progress. A lane is closed. Width limit 14'0". Speed limit 50 MPH . Until August 16, 2017 at about 6:00PM MDT.

Web Comment: Bridge construction will occur on the overpasses of the south Rexburg interchange (Exit 332). One lane will be closed in each direction of travel. The speed limit will be reduced to 50 mph. Width restrictions will be 14 feet. Watch out for construction workers.

More Info: News Release
Last updated on July 20
Switch to Road Reports
Restrictions on US 20: Idaho Falls to Montana
Map of Reports on US 20 Between Burton Road and ID 33 (near Rexburg). Bridge construction work is in progress. A lane is closed. Width limit 14'0". Speed limit 50 MPH. Until August 16, 2017 at about 6:00PM MDT. Between The South Fork Teton River Bridge (near Rexburg) and Targee Pass (2 miles east of the Island Park area). Look out for brush control operations. Until Thursday, at about 5:00PM MDT. Between Spruce Street (Ashton) and Targee Pass (3 miles east of the Island Park area). Look out for mobile maintenance operations. Look out for a slow moving maintenance vehicle. Until Thursday, at about 5:00PM MDT.
US 20 in both directions: Bridge construction, lane closed.
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup
Truck Ramp Truck Ramp Weigh Station Weigh Stations