Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
Restrictions on I-15: Utah to Pocatello
I-15: Utah to Pocatello
Between Exit 36: US 91; Hawkins Road (near Arimo) and Exit 57: Interstate 15 Business (near McCammon). The roadway is reduced to one lane. Road construction work is in progress. The road is being repaved. There is work on the shoulder. People are working in the median. Consider using an alternate route. Speed restrictions are in force. There is a width limit in effect. Speed limit 70 MPH . Width limit 15'0". Until October 15, 2017 at about 8:00PM MDT.

Web Comment: This project on I-15 is between milepost 39, 1.5 miles south of Arimo City Limits, and milepost 48, one mile north of McCammon Exit 44. Work scheduled Monday through Saturday. Traffic restrictions is in effect 24 hours a day, 7 days a week. Use caution around crews and equipment.
Last updated yesterday at 1:47pm MDT
Between US 30 (1 mile south of the Inkom area) and Exit 67: US 30; Interstate 15 Business (near Pocatello). The roadway is reduced to one lane. A lane is closed intermittently. There is work on the shoulder. People are working in the median. Speed restrictions are in force. There is a width limit in effect. Speed limit 70 MPH . Width limit 12'0". Until October 16, 2017 at about 11:59PM MDT.

Web Comment: This guardrail project is on I-15, between milepost 54.6, South Inkom, and milepost 64.12, three miles south of South 5th Avenue Exit 67. Guardrail work will be in conjunction with the I-15 bridge project between mileposts 54.9 and 58.6, then will extend to milepost 65. From mileposts 58 to 65, expect reduction down to one lane, not longer than a mile. Use caution around crews and equipment.
Last updated yesterday at 1:48pm MDT
Between US 30 (1 mile south of the Inkom area) and The Inkom Port of Entry (near Inkom). The roadway is reduced to one lane. A lane is closed intermittently. Road construction work is in progress. Bridge maintenance work is in progress. The road is being repaved. There is work on the shoulder. People are working in the median. Speed restrictions are in force. There is a width limit in effect. Speed limit 70 MPH . Width limit 12'0". Until October 15, 2017 at about 8:00PM MDT.

Web Comment: This project is on I-15, between milepost 54.9, South Inkom, and milepost 58.6, North Inkom. Crossovers will be built. Work will be done on the Rapid Creek and South Inkom Interchange bridges. Use caution around crews and equipment.
Last updated yesterday at 1:48pm MDT
Between Exit 63: Portneuf Road and Exit 71: Interstate 15 Business (Pocatello). The roadway is reduced to one lane. Bridge construction work is in progress. There is work on the shoulder. People are working in the median. Speed restrictions are in force. There is a width limit in effect. Consider using an alternate route. Drive with extreme caution. Speed limit 55 MPH . Width limit 12'0". From 5:00AM MDT to 4:00PM MDT on weekdays. Until August 31, 2017 at about 6:00PM MDT.

Web Comment: This bridge repair project is on I-15, between milepost 65, South 5th Avenue Exit, and Exit 69, Clark Street, in Pocatello. Two-way, single lane traffic control in both directions. Lane closures in effect 24 hours a day, 7 days a week. Use extreme caution on entrance and exit ramps.
Last updated yesterday at 1:49pm MDT