Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
Restrictions on US 95: Oregon to Payette
US 95: Oregon to Payette
Between I-84 and US 30; 16th Street North (1 mile south of the Fruitland area). Road maintenance work is in progress. The roadway is reduced to one lane. Look out for flaggers. Look out for loose gravel on the roadway. Expect delays. There is a width limit in effect. There is a length limit in effect. Consider using an alternate route. Expect 15 - minute delays.. Width limit 12'0". Vehicle length limit 35 ft. Until July 2.

Comment: The active work zone will be reduced down to two lanes, one in each direction NB/SB, during working hours. During nonworking hours, all travel lanes will be open. The driving surface of some lanes will not be paved, i.e. gravel surface. The Contractor anticipates working in the daytime for the portion of US-95 that stretches from 1-84 to 3 Street in Fruitland (MP 60,877 - MP 63.68). The Contractor will be limited to working at night for the rest of the project stretching from 3 Street to NW 16th Street (MP 63.68 - MP 65.00). Vehicle lane width restrictions will be in place throughout the project. Any loads over 12ft width will have to call 72 hours in advance in order to coordinate travelling through the project. Please call Styles Salek at 208-559-1275 or Lee Long at 869- 7689. From 5/13/15 to 5/22/15, vehicles over 35 foot in length will be restricted from taking 1-84 WB Exit #3 due to limited turning radius. They must exit at Exit #9 or in Oregon at Exit #276. A detour will be in place to guide the vehicles affected. Note: This only affects 1-84 WB Exit #3, all other legs of the interchange and NB/SB US-95 will not need detoured.
Last updated on May 20