Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
US 20: Parma to Boise
US 20: Road construction, roadway reduced to one lane, look out for flaggers, speed restrictions in force, width limit in effect.

Between Look Road and Pond Lane (near Caldwell). Road construction work is in progress. The roadway is reduced to one lane. Look out for flaggers. Speed restrictions are in force. There is a width limit in effect. Speed limit 45 MPH. Width limit 11'0". From 7:00AM MST to 6:00PM MST on weekdays. Until April 2, 2018 at about 6:00PM MST.

Web Comment: Width restrictions will go into effect approximately the second week of March. Contractor will be replacing drainage pipe crossing US20, Farmway Rd., and placing irrigation drainage boxes on the right of way. The addition of a left turn lane will be added on US 20 to Farmway Rd. eastbound. Traffic will be reduced to 45 mph in the construction zone.

Last updated on February 22
Switch to Winter Driving Conditions
Switch to Road Reports
Restrictions on US 20: Parma to Boise
Map of Reports on US 20 Between Look Road and Pond Lane (near Caldwell). Road construction work is in progress. The roadway is reduced to one lane. Look out for flaggers. Speed restrictions are in force. There is a width limit in effect. Speed limit 45 MPH. Width limit 11'0". From 7:00AM MST to 6:00PM MST on weekdays. Until April 2, 2018 at about 6:00PM MST. Between I-184 and I-84 (Boise). Road construction work is in progress. The roadway is reduced to two lanes. From 10:00PM MST to 7:00AM MST on weekends and from 8:00PM MST to 6:00AM MST on weekdays. Until June 15, 2018 at about 6:00AM MST.
US 20: Road construction, roadway reduced to one lane, look out for flaggers, speed restrictions in force, width limit in effect.
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup
Truck Ramp Truck Ramp Weigh Station Weigh Stations