Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
I-15: Utah to Pocatello
I-15 in both directions: Roadway reduced to one lane, alternating lane closures, paving operations, pilot car in operation, look out for flaggers, speed restrictions in force, width limit in effect.
Between Exit 3: Woodruff Road (9 miles south of the Malad City area) and Exit 22: Colton Lane (5 miles north of the Malad City area). The roadway is reduced to one lane. There are alternating lane closures. The road is being repaved. A pilot car is in operation. Look out for flaggers. Speed restrictions are in force. There is a width limit in effect. Speed limit 65 MPH . Width limit 12'0". From 7:00AM MDT to 7:00PM MDT on weekdays and Saturdays. Until Sunday, at about 7:00PM MDT.

Web Comment: This paving project is on I-15, between milepost 20.196, seven miles north of Malad, and milepost 3, three miles north of the Idaho-Utah border. Use caution around crews and equipment.
Last updated on July 21
I-15 in both directions: Roadway reduced to one lane, road construction, paving operations, bridge maintenance operations, work on the shoulder, work in the median, speed restrictions in force, width limit in effect.
Between Exit 31: ID 40; Downey Road and Exit 40: Arimo Road (2 to 7 miles south of the Arimo area). The roadway is reduced to one lane. Road construction work is in progress. The road is being repaved. Bridge maintenance work is in progress. There is work on the shoulder. People are working in the median. Speed restrictions are in force. There is a width limit in effect. Speed limit 70 MPH . Width limit 12'0". Until November 1.

Web Comment: This project is on I-15, between milepost 31, Downey Exit 31, and milepost 36, Virginia Exit 36. Use caution around crews and equipment.
Last updated on July 19
I-15 in both directions: Roadway reduced to one lane, road construction, work on the shoulder, work in the median, speed restrictions in force.
Between Exit 57: Interstate 15 Business (Inkom) and Exit 63: Portneuf Road (2 miles north of the Inkom area). The roadway is reduced to one lane. Road construction work is in progress. There is work on the shoulder. People are working in the median. Speed restrictions are in force. Speed limit 70 MPH . Width limit 12'0". From 7:00AM MDT to 5:30PM MDT on weekdays. Until August 2.

Web Comment: This project is on I-15, between milepost 60.5, three miles south of Portneuf Exit 63, and milepost 57.5, South Inkom Port of Entry. Use caution around crews and equipment.
Last updated on July 22
Switch to Winter Driving Conditions
Switch to Road Reports
Restrictions on I-15: Utah to Pocatello
Map of Reports on I-15 Between Exit 3: Woodruff Road (9 miles south of the Malad City area) and Exit 22: Colton Lane (5 miles north of the Malad City area). The roadway is reduced to one lane. There are alternating lane closures. The road is being repaved. A pilot car is in operation. Look out for flaggers. Speed restrictions are in force. There is a width limit in effect. Speed limit 65 MPH. Width limit 12'0". From 7:00AM MDT to 7:00PM MDT on weekdays and Saturdays. Until Sunday, at about 7:00PM MDT. Between Exit 3: Woodruff Road (9 miles south of the Malad City area) and Exit 22: Colton Lane (5 miles north of the Malad City area). The roadway is reduced to one lane. There are alternating lane closures. The road is being repaved. A pilot car is in operation. Look out for flaggers. Speed restrictions are in force. There is a width limit in effect. Speed limit 65 MPH. Width limit 12'0". From 7:00AM MDT to 7:00PM MDT on weekdays and Saturdays. Until Sunday, at about 7:00PM MDT. Between Exit 3: Woodruff Road (9 miles south of the Malad City area) and Exit 22: Colton Lane (5 miles north of the Malad City area). The roadway is reduced to one lane. There are alternating lane closures. The road is being repaved. A pilot car is in operation. Look out for flaggers. Speed restrictions are in force. There is a width limit in effect. Speed limit 65 MPH. Width limit 12'0". From 7:00AM MDT to 7:00PM MDT on weekdays and Saturdays. Until Sunday, at about 7:00PM MDT. Between Exit 31: ID 40; Downey Road and Exit 40: Arimo Road (2 to 7 miles south of the Arimo area). The roadway is reduced to one lane. Road construction work is in progress. The road is being repaved. Bridge maintenance work is in progress. There is work on the shoulder. People are working in the median. Speed restrictions are in force. There is a width limit in effect. Speed limit 70 MPH. Width limit 12'0". Until November 1. Between Exit 57: Interstate 15 Business (Inkom) and Exit 63: Portneuf Road (2 miles north of the Inkom area). The roadway is reduced to one lane. Road construction work is in progress. There is work on the shoulder. People are working in the median. Speed restrictions are in force. Speed limit 70 MPH. Width limit 12'0". From 7:00AM MDT to 5:30PM MDT on weekdays. Until August 2.
I-15 in both directions: Roadway reduced to one lane, alternating lane closures, paving operations, pilot car in operation, look out for flaggers, speed restrictions in force, width limit in effect.
I-15 in both directions: Roadway reduced to one lane, road construction, paving operations, bridge maintenance operations, work on the shoulder, work in the median, speed restrictions in force, width limit in effect.
I-15 in both directions: Roadway reduced to one lane, road construction, work on the shoulder, work in the median, speed restrictions in force.
Inkom Weigh Station
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup
Truck Ramp Truck Ramp Weigh Station Weigh Stations