Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
Restrictions on I-15: Utah to Pocatello
I-15: Utah to Pocatello
Between US 30 (2 miles south of the Inkom area) and The Inkom Port of Entry (near Inkom). The roadway is reduced to one lane. A lane is closed intermittently. Road construction work is in progress. The road is being repaved. Bridge maintenance work is in progress. There is work on the shoulder. People are working in the median. Expect delays of uncertain duration. Look out for flaggers. Speed restrictions are in force. There is a width limit in effect. Speed limit 65 MPH . Width limit 12'5". Until November 10, 2017 at about 5:00PM MDT.

Web Comment: This project is on I-15, between milepost 54, South Inkom, and milepost 59, Inkom Port of Entry. Crossovers are being utilized. Work will be done on the Rapid Creek and South Inkom Interchange bridges. Use caution around crews and equipment.
Last updated on October 12
Between US 30 (1 mile south of the Inkom area) and Exit 67: US 30; Interstate 15 Business (near Pocatello). The roadway is reduced to one lane. A lane is closed intermittently. Road construction work is in progress. The road is being repaved. There is work on the shoulder. People are working in the median. Expect delays. Look out for flaggers. Speed restrictions are in force. There is a width limit in effect. Width limit 12'0". Speed limit 65 MPH . Until today at about 11:59PM MDT.

Web Comment: This guardrail project is on I-15, between milepost 54.6, South Inkom, and milepost 64.12, three miles south of South 5th Avenue Exit 67. Guardrail work will be in conjunction with the I-15 bridge project between mileposts 54.9 and 58.6, then will extend to milepost 65. From mileposts 58 to 65, expect reduction down to one lane, not longer than a mile. Use caution around crews and equipment.
Last updated on October 12
Between Exit 63: Portneuf Road and Exit 71: Interstate 15 Business (Pocatello). The roadway is reduced to one lane. Road construction work is in progress. Bridge construction work is in progress. There is work on the shoulder. People are working in the median. Consider using an alternate route. Speed restrictions are in force. There is a width limit in effect. Truck restrictions are in force. Drive with extreme caution. Speed limit 55 MPH . Width limit 12'0". Until October 31, 2017 at about 6:00PM MDT.

Web Comment: Bridge deck and structure repair on I-15, between milepost 65, two miles north of South 5th Avenue Exit 67, and milepost 71, Pocatello Creek Interchange. Single lane in both directions. Lane closures in effect 24 hours a day, seven days a week. Use extreme caution on entrance and exit ramps.
Last updated on October 12