I-84: Boise to Twin Falls
I-84: Road construction, bridge construction, roadway reduced to one lane, speed restrictions in force, width limit in effect.
Between Exit 54: US 20; Broadway Avenue and Exit 60: The Isaacs Canyon Interchange (near Boise). Road construction work is in progress. Bridge construction work is in progress. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. Speed limit 55 MPH . Width limit 16'0". Until October 1.

Comment: I-84 is reduced to one lane in each direction over the Gowen Road Interchange. The Westbound on ramp from Gowen Road to I-84 will be closed the nights of July 31, 2015 and August 1, 2015 between the hours of 8pm and 7am. Detour will be via Federal Way and the Broadway Ave interchange. Work is taking place on Gowen Road (SH-21) between Eisenman Road and Federal Way. Intermittent lane closures are expected when weather permits.

More Info: gowen traffic pattern
Last updated on July 30
I-84: Paving operations, alternating lane closures, loose gravel, delays, width limit in effect.
Between The Bliss Rest Area - Elmore County Line (1 mile west of the Bliss area) and Exit 155: State Highway 46 Spur (5 miles west of the Wendell area). The road is being repaved. There are alternating lane closures. Look out for loose gravel on the roadway. Expect delays. There is a width limit in effect. Width limit 14'0". Speed limit 35 MPH . Until Friday, at about 6:00PM MDT.

Comment: Roadway sealcoat work on I-84 between west Bliss exit and Wendell (milepost 137 to 150).
Last updated today at 1:58pm MDT
Switch to Winter Driving Conditions
Switch to Road Reports
Restrictions on I-84: Boise to Twin Falls
Map of Reports on I-84 Between Exit 52: Orchard Street and Exit 57: ID 21; Gowen Road (near Boise). Road construction work is in progress. Bridge construction work is in progress. The roadway is reduced to one lane. Speed restrictions are in force. Speed limit 55 MPH. From 8:00PM MDT to 5:00AM MDT daily. Until December 1. Between Exit 54: US 20; Broadway Avenue and Exit 60: The Isaacs Canyon Interchange (near Boise). Road construction work is in progress. Bridge construction work is in progress. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. Speed limit 55 MPH. Width limit 16'0". Until October 1. Between The Bliss Rest Area - Elmore County Line (1 mile west of the Bliss area) and Exit 155: State Highway 46 Spur (5 miles west of the Wendell area). The road is being repaved. There are alternating lane closures. Look out for loose gravel on the roadway. Expect delays. There is a width limit in effect. Width limit 14'0". Speed limit 35 MPH. Until Friday, at about 6:00PM MDT.
I-84: Road construction, bridge construction, roadway reduced to one lane, speed restrictions in force, width limit in effect.
I-84: Paving operations, alternating lane closures, loose gravel, delays, width limit in effect.
East Boise Weigh Station
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup
Truck Ramp Truck Ramp Weigh Station Weigh Stations