I-84: Road construction, bridge construction, roadway reduced to one lane, width limit in effect, work on the shoulder, work in the median, speed restrictions in force.
Between Exit 52: Orchard Street and Exit 57: Gowen Road (near Boise). Road construction work is in progress. Bridge construction work is in progress. The roadway is reduced to one lane. There is a width limit in effect. There is work on the shoulder. People are working in the median. Speed restrictions are in force. Speed limit 55 MPH . Width limit 14'0". From 8:00PM MDT to 5:00AM MDT daily. Until December 1, 2015.

Comment: 14’ width restriction on Broadway WB onramp. Mainline lanes have no width restriction. Please call Dana at 830-3617 regarding wider loads.
Last updated on July 24
I-84: Road closed to traffic, detour in operation.
Between Exit 54: US 20; Broadway Avenue and Exit 60: The Isaacs Canyon Interchange (near Boise). The road is closed to traffic. A detour is in operation. From 7:00PM MDT to 11:00PM MDT on Monday, Tuesday, Wednesday and Thursday. Until Thursday, at about 11:00PM MDT.

Comment: I-84 traffic will be detoured in east Boise in the evenings tonight through Thursday (July 28 - 31) as blasting continues at the Gowen Interchange. All traffic will be detoured off I-84 at the Broadway and Eisenman interchanges and onto Federal Way.

More Info: gowen blasting
Last updated yesterday at 10:38am MDT
I-84 in both directions: Road closed intermittently, truck restrictions in force, roadway reduced to one lane, night time construction work, follow the detour signs.
At ID 21 (Boise). The road is closed intermittently. Truck restrictions are in force. The roadway is reduced to one lane. Night time construction work is in progress. Follow the detour signs. Speed limit 55 MPH . Width limit 12'0". From 7:00PM MDT to 10:00PM MDT daily. Until September 1.

Comment: I-84 Loads over 12’ wide are being detoured between exits 57 and 59 via Federal Way and Eisenman Roads. This restriction will be in place until late October 2014. Rock blasting will be happening between the hours of 7pm to dusk on various nights for the next 3 months. Detour will be in place when blasting near I-84. Eastbound off and on-ramps, and Gowen Road between I-84 and Eisenman Road will be intermittently closed the nights for blasting. Eastbound ramp traffic will be detoured to the Eisenman Interchange (exit 60).
Last updated on July 10
I-84: Bridge maintenance operations, traffic restrictions in force, on, overpass, roadway reduced to one lane, width limit in effect.
At Exit 125: 18th East Street (3 miles east of the Glenns Ferry area). Bridge maintenance work is in progress. Traffic restrictions are in force. On. Overpass. The roadway is reduced to one lane. There is a width limit in effect. Width limit 13'0". Until August 29.

Comment: Bridge resurfacing project affecting local roadway at Paradise Valley/Exit 125. No restrictions on Interstate 84. Contractor: L&J Construction, 406-599-7776
Last updated on July 22
I-84 in both directions: Bridge maintenance operations, roadway reduced to one lane, speed restrictions in force, width limit in effect.
Between Exit 137 and Exit 141: I-84B; US 26 (near Bliss). Bridge maintenance work is in progress. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. Speed limit 65 MPH . Width limit 13'0". Until August 29.

Comment: Bridge resurfacing project on Union Pacific Railroad overpass west of Exit 141. Watch for trucks entering and exiting work zone. Wide loads must use I-84 business loop between Exits 137 and 141 through Bliss. Contractor: L&J Construction, 406-599-7776
Last updated on July 22
Switch to Winter Driving Conditions
Switch to Road Reports
Restrictions on I-84: Boise to Twin Falls
Map of Reports on I-84 Between Exit 52: Orchard Street and Exit 57: Gowen Road (near Boise). Road construction work is in progress. Bridge construction work is in progress. The roadway is reduced to one lane. There is a width limit in effect. There is work on the shoulder. People are working in the median. Speed restrictions are in force. Speed limit 55 MPH. Width limit 14'0". From 8:00PM MDT to 5:00AM MDT daily. Until December 1, 2015. Between Exit 54: US 20; Broadway Avenue and Exit 60: The Isaacs Canyon Interchange (near Boise). The road is closed to traffic. A detour is in operation. From 7:00PM MDT to 11:00PM MDT on Monday, Tuesday, Wednesday and Thursday. Until Thursday, at about 11:00PM MDT. Between Exit 54: US 20; Broadway Avenue and Exit 60: The Isaacs Canyon Interchange (near Boise). Road construction work is in progress. Bridge construction work is in progress. There is work on the shoulder. People are working in the median. The roadway is reduced to one lane. Speed restrictions are in force. Speed limit 55 MPH. Until October 1, 2015. Between Exit 137 and Exit 141: I-84B; US 26 (near Bliss). Bridge maintenance work is in progress. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. Speed limit 65 MPH. Width limit 13'0". Until August 29.
I-84: Road construction, bridge construction, roadway reduced to one lane, width limit in effect, work on the shoulder, work in the median, speed restrictions in force.
I-84: Road closed to traffic, detour in operation.
I-84 in both directions: Road closed intermittently, truck restrictions in force, roadway reduced to one lane, night time construction work, follow the detour signs.
I-84: Bridge maintenance operations, traffic restrictions in force, on, overpass, roadway reduced to one lane, width limit in effect.
I-84 in both directions: Bridge maintenance operations, roadway reduced to one lane, speed restrictions in force, width limit in effect.
East Boise Weigh Station
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup
Truck Ramp Truck Ramp Weigh Station Weigh Stations