Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
I-84: Oregon to Boise
I-84: Road construction, work on the shoulder, roadway reduced to one lane, speed restrictions in force, width limit in effect.
Between The Oregon State Line (near Fruitland) and Exit 17: Sand Hollow (12 miles west of the Caldwell exit). Road construction work is in progress. There is work on the shoulder. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. Speed limit 65 MPH . Width limit 14'0". Until October 31.

Comment: The normal operating hours for this project will be Monday through Friday, 6 AM to 8 PM from June 16th until October 31, 2014. Traffic will be placed into a two-way, opposing single lane configuration. Crossovers will be located at MP0.25, either side of IC 03, and west of IC 13. The Westbound on and off ramps at Interchange 09, (US30) will be closed until early September. Motorists are advised to use alternate routes at IC 03 or at IC 13. Motorists are advised to use Exit 3, US95 and proceed north to US30. A signed detour will be posted to direct traffic to east to IC 13, where they will be directed over to the westbound direction.
Last updated on July 23
I-84 eastbound: Road blocked, crash.
Between Exit 28: 10th Street and Exit 29: US 20; Franklin Road (Caldwell). The road is blocked. Look out for an accident.

Comment: Milepost 28.1 in Caldwell. One WB lane is also blocked.
Last updated today at 12:55pm MDT
I-84 westbound: Road construction, bridge construction, roadway reduced to one lane, width limit in effect, detour in operation, speed restrictions in force.
Between Exit 29: US 20; Franklin Road and Exit 38: I-84B (near Nampa). Road construction work is in progress. Bridge construction work is in progress. The roadway is reduced to one lane. There is a width limit in effect. A detour is in operation. Speed restrictions are in force. Speed limit 55 MPH . Width limit 10'0". Until October 3.

Comment: **West-Bound Detour: Starting at 12:01 AM on Monday (6/23) morning and continuing for several weeks (currently scheduled for July 14, 2014), wide loads over 10 feet will be required to exit at Exit 36 (Franklin 1C). The detour for oversize loads will be routed north to Karcher Rd. between Exit 36 and Exit 33 (Hwy 55). ***Truck Height, Length and Axie Limits posted above with (***)
Last updated on July 24
I-84 eastbound: Road construction, bridge construction, roadway reduced to one lane, speed restrictions in force, width limit in effect, detour in operation.
Between Exit 29: US 20; Franklin Road and Exit 38: I-84B (near Nampa). Road construction work is in progress. Bridge construction work is in progress. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. A detour is in operation. Speed limit 55 MPH . Width limit 18'0". Until October 3.

Comment: * Traffic will be open in two lanes between 5:00 AM and 9:00 PM in both directions. Traffic may be reduced to one lane between 9:00 PM and 5:00 AM. **East-Bound Detour wide loads over 18 feet will be required to exit at Exit 33 (Hwy 55). The detour for oversize loads will be routed north to Karcher Rd. between Exit 36 and Exit 33 (Hwy) 55
Last updated on July 24
Switch to Winter Driving Conditions
Switch to Road Reports
Restrictions on I-84: Oregon to Boise
Map of Reports on I-84 Between The Oregon State Line (near Fruitland) and Exit 17: Sand Hollow (12 miles west of the Caldwell exit). Road construction work is in progress. There is work on the shoulder. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. Speed limit 65 MPH. Width limit 14'0". Until October 31. Between Exit 29: US 20; Franklin Road and Exit 35: ID 55; Nampa Boulevard (near Caldwell). Road maintenance work is in progress. The right lane is closed. Until today at about 3:00PM MDT. Between Exit 29: US 20; Franklin Road and Exit 38: I-84B (near Nampa). Road construction work is in progress. Bridge construction work is in progress. The roadway is reduced to one lane. There is a width limit in effect. A detour is in operation. Speed restrictions are in force. Speed limit 55 MPH. Width limit 10'0". Until October 3. Between Exit 29: US 20; Franklin Road and Exit 38: I-84B (near Nampa). Road construction work is in progress. Bridge construction work is in progress. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. A detour is in operation. Speed limit 55 MPH. Width limit 18'0". Until October 3. Between Exit 38: I-84B (Meridian) and I-184 (Boise). Road construction work is in progress. Bridge construction work is in progress. There is work on the shoulder. The roadway is reduced to two lanes. Speed restrictions are in force. Speed limit 55 MPH. Until October 31, 2015.
I-84: Road construction, work on the shoulder, roadway reduced to one lane, speed restrictions in force, width limit in effect.
I-84 eastbound: Road blocked, crash.
I-84 westbound: Road construction, bridge construction, roadway reduced to one lane, width limit in effect, detour in operation, speed restrictions in force.
I-84 eastbound: Road construction, bridge construction, roadway reduced to one lane, speed restrictions in force, width limit in effect, detour in operation.
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup
Truck Ramp Truck Ramp Weigh Station Weigh Stations