Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
I-84
I-84 eastbound: Road construction, roadway reduced to one lane, speed restrictions in force.
Between Exit 74: Simco Road and Exit 90: I-84B (2 to 10 miles west of the Mountain Home area). Road construction work is in progress. The roadway is reduced to one lane. Speed restrictions are in force. Speed limit 65 MPH . Width limit 16'0". Until October 20, 2017 at about 11:59PM MDT.

Web Comment: Road work will continue on Monday September 25. Traffic will remain in a two-way traffic pattern on the east bound side of I-84 between MP 82 and 90. West bound on ramp traffic at interchange 90 will be allowed to stay on the westbound side of I-84. East bound traffic – 16’ width restriction – widths greater than 12’ will require encroachment onto the shoulder West bound traffic – 12’ width restriction
Last updated on September 21
I-84 westbound: Road construction, roadway reduced to one lane, width limit in effect, speed restrictions in force.
Between Exit 90: I-84B and Exit 74: Simco Road (2 to 10 miles west of the Mountain Home area). Road construction work is in progress. The roadway is reduced to one lane. There is a width limit in effect. Speed restrictions are in force. Width limit 12'0". Speed limit 65 MPH . Until October 20, 2017 at about 11:59PM MDT.

Web Comment: Road work will continue on Sunday September 10. Intermittent lane closures will continue until Tuesday evening September 12. Beginning Tuesday night/Wednesday morning traffic will be switched to two-way traffic on the east bound side of I-84 between MP 82 and 90. West bound on ramp traffic at interchange 90 will be allowed to stay on the westbound side of I-84. West bound traffic – 12’ width restriction
Last updated today at 8:18am MDT
I-84 westbound: Ramp restrictions in force, on the on ramp, width limit in effect.
At Exit 90: I-84B (2 miles west of the Mountain Home area). Ramp restrictions are in force. On the on ramp. There is a width limit in effect. Width limit 11'0". Until October 20, 2017 at about 7:00PM MDT.

Web Comment: Interchange 90 – West bound on ramp – 11’ width restrictions 7 am to 7 pm 12’ width restrictions 7 pm to 7 am
Last updated on September 21
I-84: Road maintenance operations, alternating lane closures, speed restrictions in force, width limit in effect.
Between Exit 120: Bannock Avenue and Eastbound Bliss Rest Area (7 miles east of the Glenns Ferry area). Road maintenance work is in progress. There are alternating lane closures. Speed restrictions are in force. There is a width limit in effect. Speed limit 70 MPH . Width limit 12'0". From 7:00AM MDT to 6:00PM MDT on weekdays. Until October 6, 2017 at about 5:00PM MDT.

Web Comment: Concrete pavement smoothness grinding, patching and repair between Glenns Ferry and King Hill areas (milepost 120-130). Contractor: Acme Concrete Paving, 509-242-1234
Last updated today at 12:54pm MDT
I-84 in both directions: Left lane closed, because of bridge maintenance work, paving operations, width limit in effect.
Between Exit 141: I-84B and Exit 147: 2350 South Road (4 to 5 miles east of the Bliss area). The left lane is closed because of bridge maintenance work. The road is being repaved. There is a width limit in effect. Width limit 14'0". Until October 20, 2017 at about 5:00PM MDT.

Web Comment: Road surface work at Malad River bridges (milepost 146).
Last updated today at 12:53pm MDT
I-84: Paving operations, roadway reduced to two lanes, speed restrictions in force, width limit in effect, exit ramp closed, entrance ramp closed.
Between Exit 157: ID 46 (near Wendell) and Exit 168: Jerome/Lincoln Street (near Jerome). The road is being repaved. The roadway is reduced to two lanes. Speed restrictions are in force. There is a width limit in effect. The exit ramp is closed. The entrance ramp is closed. Speed limit 70 MPH . Width limit 14'0". Until October 27, 2017 at about 5:00PM MDT.

Web Comment: Paving and bridge work on I-84 between Wendell and Jerome (milepost 157 to 167). Ramp closures at Exit 165, use Exit 168 to access Jerome.
Last updated on September 11
I-84 in both directions: Road construction, roadway reduced to two lanes, paving operations, ramp restrictions in force, speed restrictions in force, width limit in effect.
Between Exit 173: US 93 (9 miles west of the Hazelton area) and Exit 201: ID 25; Kasota Road (4 miles east of the Hazelton area). Road construction work is in progress. The roadway is reduced to two lanes. The road is being repaved. Ramp restrictions are in force. Speed restrictions are in force. There is a width limit in effect. Speed limit 70 MPH . Width limit 12'0". Until November 17, 2017 at about 8:00PM MDT.

Web Comment: I-84 reconstruction and bridge rehabilitation work of eastbound lanes. All traffic in westbound lanes between milepost 181 to 194. Alternating ramp closures for eastbound traffic through construction zone, watch message signs through project area for current closures. Contractor: Knife River Inc., 208-362-6152
Last updated on September 14
I-84 in both directions: Bridge construction, roadway reduced to two lanes, width limit in effect, speed restrictions in force.
Between Exit 211: US 30; ID 24 and Exit 216: ID 25; ID 77 (5 miles east of the Heyburn area). Bridge construction work is in progress. The roadway is reduced to two lanes. There is a width limit in effect. Speed restrictions are in force. Speed limit 65 MPH . Width limit 14'0". Until October 27, 2017 at about 5:00PM MDT.

Web Comment: Bridge construction over Snake River at milepost 216. Use caution at on and off ramps at Declo Interchange (Exit 216).
Last updated on September 22
I-84 westbound: Left lane closed, due to bridge construction work, width limit in effect.
Between Exit 222: I-86 and Exit 216: ID 25; ID 77 (5 to 7 miles east of the Heyburn area). The left lane is closed due to bridge construction work. There is a width limit in effect. Width limit 11'0". Until October 20, 2017 at about 11:59PM MDT.

Web Comment: Bridge maintenance work in westbound lanes at milepost 218.
Last updated on September 21
Switch to Road Reports
Truck Restrictions on I-84
Map of Reports on I-84 Between Exit 46: ID 55; Eagle Road and Exit 52: Orchard Street (near Boise). Road construction work is in progress. The roadway is reduced to two lanes. Speed restrictions are in force. Speed limit 55 MPH. From 10:00PM MDT to 7:00AM MDT on weekdays and Saturday. Until October 27, 2017 at about 5:00AM MDT. Between Exit 74: Simco Road and Exit 90: I-84B (2 to 10 miles west of the Mountain Home area). Road construction work is in progress. The roadway is reduced to one lane. Speed restrictions are in force. Speed limit 65 MPH. Width limit 16'0". Until October 20, 2017 at about 11:59PM MDT. Between Exit 90: I-84B and Exit 74: Simco Road (2 to 10 miles west of the Mountain Home area). Road construction work is in progress. The roadway is reduced to one lane. There is a width limit in effect. Speed restrictions are in force. Width limit 12'0". Speed limit 65 MPH. Until October 20, 2017 at about 11:59PM MDT. Between Exit 120: Bannock Avenue and Eastbound Bliss Rest Area (7 miles east of the Glenns Ferry area). Road maintenance work is in progress. There are alternating lane closures. Speed restrictions are in force. There is a width limit in effect. Speed limit 70 MPH. Width limit 12'0". From 7:00AM MDT to 6:00PM MDT on weekdays. Until October 6, 2017 at about 5:00PM MDT. Between Exit 141: I-84B and Exit 147: 2350 South Road (4 to 5 miles east of the Bliss area). The left lane is closed because of bridge maintenance work. The road is being repaved. There is a width limit in effect. Width limit 14'0". Until October 20, 2017 at about 5:00PM MDT. Between Exit 157: ID 46 (near Wendell) and Exit 168: Jerome/Lincoln Street (near Jerome). The road is being repaved. The roadway is reduced to two lanes. Speed restrictions are in force. There is a width limit in effect. The exit ramp is closed. The entrance ramp is closed. Speed limit 70 MPH. Width limit 14'0". Until October 27, 2017 at about 5:00PM MDT. Between Exit 173: US 93 (9 miles west of the Hazelton area) and Exit 201: ID 25; Kasota Road (4 miles east of the Hazelton area). Road construction work is in progress. The roadway is reduced to two lanes. The road is being repaved. Ramp restrictions are in force. Speed restrictions are in force. There is a width limit in effect. Speed limit 70 MPH. Width limit 12'0". Until November 17, 2017 at about 8:00PM MDT. Between Exit 222: I-86 and Exit 216: ID 25; ID 77 (5 to 7 miles east of the Heyburn area). The left lane is closed due to bridge construction work. There is a width limit in effect. Width limit 11'0". Until October 20, 2017 at about 11:59PM MDT.
I-84 eastbound: Road construction, roadway reduced to one lane, speed restrictions in force.
I-84 westbound: Road construction, roadway reduced to one lane, width limit in effect, speed restrictions in force.
I-84 westbound: Ramp restrictions in force, on the on ramp, width limit in effect.
I-84: Road maintenance operations, alternating lane closures, speed restrictions in force, width limit in effect.
I-84 in both directions: Left lane closed, because of bridge maintenance work, paving operations, width limit in effect.
I-84: Paving operations, roadway reduced to two lanes, speed restrictions in force, width limit in effect, exit ramp closed, entrance ramp closed.
I-84 in both directions: Road construction, roadway reduced to two lanes, paving operations, ramp restrictions in force, speed restrictions in force, width limit in effect.
I-84 in both directions: Bridge construction, roadway reduced to two lanes, width limit in effect, speed restrictions in force.
I-84 westbound: Left lane closed, due to bridge construction work, width limit in effect.
East Boise Weigh Station
Cotterell Weigh Station
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup
Truck Ramp Truck Ramp Weigh Station Weigh Stations