US 95
US 95 in both directions: Bridge construction, roadway reduced to one lane, temporary traffic lights, truck restrictions in force.
Between Sportsman Access Road and Sportsman Access Road (6 miles south of the White Bird area). Bridge construction work is in progress. The roadway is reduced to one lane. Look out for temporary traffic lights. Truck restrictions are in force. Width limit 14'0". Until September 30.

Comment: This work at Milepost 216.5 is to remove and replace the Award Bridge deck. Motorists are advised to watch for workers and equipment working on either side of the roadway while construction is in progress. The current width restriction of 14'0" is in force. Idaho Traffic Control can be contacted at (208) 455-3220 for coordinating wide load movement through the project.
Last updated today at 6:15am PDT
Switch to Winter Driving Conditions
Switch to Road Reports
Truck Restrictions on US 95
Map of Reports on US 95 Between Thomason Lane (9 miles north of the Cambridge area) and Colt Street (New Meadows). Road construction work is in progress. The roadway is reduced to one lane. Look out for flaggers. Expect delays. A pilot car is in operation. Expect 15 - minute delays. From 7:00AM MDT to 6:00PM MDT daily. Until September 30. Between 45th Parallel Road and Smokey Boulder Road (2 to 5 miles north of the New Meadows area). Road maintenance work is in progress. The roadway is reduced to one lane. Look out for flaggers. Short delays are possible. From 9:00AM MDT to 4:00PM MDT on Monday, Tuesday, Wednesday and Thursday. Until Thursday, at about 4:00PM MDT. Between White Bird Creek Bridge (5 miles north of the White Bird area) and Lake Road (5 miles south of the Grangeville area). Road construction work is in progress. There is work on the shoulder. Until October 10. Between Cummins Road and Fernand South Road (near Ferdinand). Road construction work is in progress. There is work on the shoulder. Look out for loose gravel on the roadway. Until October 10. Between Bunco Road - Brunner Road (near Athol) and Old House Road (2 miles north of the Athol area). Major road construction work is in progress. The roadway is reduced to one lane because of a new road layout. Expect changing traffic patterns. On bridges. Reduce your speed. Look out for flaggers. Until September 30.
US 95 in both directions: Bridge construction, roadway reduced to one lane, temporary traffic lights, truck restrictions in force.
US 95: Lewiston Hill
US 95: Whitebird Hill
Bonners Ferry Weigh Station
Lewiston Weigh Station
Marsing Weigh Station
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup
Truck Ramp Truck Ramp Weigh Station Weigh Stations