Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
Truck Restrictions on I-84
I-84
Between Exit 54: US 20; Broadway Avenue and Exit 60: The Isaacs Canyon Interchange (near Boise). Road construction work is in progress. Bridge construction work is in progress. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. Speed limit 55 MPH . Width limit 15'0". Until October 1.

Web Comment: Tonight through Wednesday night (Aug. 31-Sept. 2), crews will be paving Gowen Road from the railroad bridge to the I-84 eastbound ramps. Paving work will begin at 8 p.m. and end at 5 a.m. Over the next few nights, drivers can expect: •Signals will be turned off and flaggers will control traffic. •Traffic will be intermittently stopped for periods of up to 20 minutes. •Lanes will be restricted. •I-84 on- and off-ramps at Broadway and Gowen will be intermittently closed from 7 a.m. to 7 p.m. when the seal coat is being applied (Aug. 20-26). •The speed limit will be 55 mph on I-84 in the work zone between Broadway and Eisenman. The speed limit on the ramps will be reduced to 35 mph with an advisory of 25 mph at Broadway and Gowen. While crews are seal coating the ramps, drivers will travel across loose gravel. IWork is taking place on Gowen Road (SH-21) between Eisenman Road and Federal Way. Intermittent lane closures are expected when weather permits.

More Info: ramp closurerestrictions
Last updated on August 31
Between Exit 211: US 30; ID 24 and Exit 222: I-86 (5 to 6 miles east of the Heyburn area). Look out for long term road construction work due to bridge construction work. The roadway is reduced to two lanes. Speed restrictions are in force. There is a width limit in effect. Drive with extreme caution. Speed limit 65 MPH . Width limit 12'0". Until June 2, 2017.

Web Comment: Reconstruction of the Snake River twin bridges (milepost 216). Westbound bridge to be replaced first. All traffic on eastbound lanes. Reduce speed. Narrow lanes. Use caution at entry and exit ramps at Exit 216. Contractor: Ralph Wadsworth Construction, 801-301-2696

More Info: Detour and Alternate Routes
Last updated on August 17