Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
ID 3
ID 3: Road construction, roadway reduced to one lane, pilot car in operation, look out for flaggers, width limit in effect, delays.
Between First Avenue (Deary) and ID 8; The Junction of Highway 3 and Highway 8 in Bovill (Bovill). Road construction work is in progress. The roadway is reduced to one lane. A pilot car is in operation. Look out for flaggers. There is a width limit in effect. Expect delays. Width limit 12'0". Expect 15 - minute delays.. Until September 25.

Web Comment: Road construction will begin August 18th between the Junction of Highway 3 (Deary) and Highway 8 in Bovill. Traffic will be reduced to one lane in both directions with a pilot car. The Contractor is Poe Asphalt Paving, Inc. Jeremy Walkup and Traffic control is Eclipse Traffic Control, Ricki Lanham.
Last updated on August 28
Switch to Winter Driving Conditions
Switch to Road Reports
Truck Restrictions on ID 3
Map of Reports on ID 3 Between First Avenue (Deary) and ID 8; The Junction of Highway 3 and Highway 8 in Bovill (Bovill). Road construction work is in progress. The roadway is reduced to one lane. A pilot car is in operation. Look out for flaggers. There is a width limit in effect. Expect delays. Width limit 12'0". Expect 15 - minute delays. Until September 25.
ID 3: Road construction, roadway reduced to one lane, pilot car in operation, look out for flaggers, width limit in effect, delays.
ID 3: Kendrick
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup
Truck Ramp Truck Ramp Weigh Station Weigh Stations