Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
I-84
I-84: Road maintenance operations, alternating lane closures, speed restrictions in force, width limit in effect.
Between Exit 120: Bannock Avenue and Eastbound Bliss Rest Area (7 miles east of the Glenns Ferry area). Road maintenance work is in progress. There are alternating lane closures. Speed restrictions are in force. There is a width limit in effect. Width limit 10'0". Speed limit 70 MPH . Until September 29, 2017 at about 5:00PM MDT.

Web Comment: Concrete pavement smoothness grinding, patching and repair between Glenns Ferry and King Hill areas (milepost 120-130). Starting June 6, the width limit will be 10 feet and will continue for 4 weeks. Contractor: Acme Concrete Paving, 509-242-1234
Last updated today at 7:55am MDT
I-84 in both directions: Road construction, roadway reduced to two lanes, paving operations, work on the shoulder, speed restrictions in force, width limit in effect.
Between Exit 173: US 93 and Exit 194: ID 25; Ridgeway Road (1 to 9 miles west of the Hazelton area). Road construction work is in progress. The roadway is reduced to two lanes. The road is being repaved. There is work on the shoulder. Speed restrictions are in force. There is a width limit in effect. Speed limit 70 MPH . Width limit 14'0". Until November 17, 2017 at about 8:00PM MDT.

Web Comment: I-84 reconstruction and bridge rehabilitation work of eastbound lanes. All traffic in westbound lanes between milepost 181 to 189. Contractor: Knife River Inc., 208-362-6152
Last updated on June 15
I-84: Road closed to traffic, detour in operation, because of construction work.
Between Exit 211: US 30; ID 24 and Exit 216: ID 25; ID 77 (5 miles east of the Heyburn area). The road is closed to traffic. A detour is in operation because of construction work. Until tomorrow at about 5:00AM MDT.

Web Comment: I-84 closed overnight for concrete placement at Snake River bridge. Use detour through Rupert or Burley between Exits 211 and 216.

More Info: Detour routes
Last updated today at 7:51am MDT
I-84 in both directions: Long term road construction, due to bridge construction work, roadway reduced to two lanes, speed restrictions in force, width limit in effect, drive with extreme caution.
Between Exit 211: US 30; ID 24 and Exit 222: I-86 (5 miles east of the Heyburn area). Look out for long term road construction work due to bridge construction work. The roadway is reduced to two lanes. Speed restrictions are in force. There is a width limit in effect. Drive with extreme caution. Speed limit 65 MPH . Width limit 15'0". Until July 28, 2017 at about 5:00PM MDT.

Web Comment: Reconstruction of the Snake River twin bridges (milepost 216). eastbound bridge under construction. All traffic on westbound lanes. Reduce speed. Narrow lanes. Use caution at entry and exit ramps at Exit 216. Contractor: Ralph Wadsworth Construction, 801-301-2696

More Info: Detour and Alternate Routes
Last updated today at 7:20am MDT
I-84 westbound: Bridge maintenance operations, bridge closed, width limit in effect, speed restrictions in force, follow local detour.
Between Exit 222: I-86 and Exit 216: ID 25; ID 77 (6 to 7 miles east of the Heyburn area). Bridge maintenance work is in progress. The bridge is closed. There is a width limit in effect. Speed restrictions are in force. Follow the local detour. Speed limit 65 MPH . Width limit 15'0". Until August 18, 2017 at about 5:00PM MDT.

Web Comment: Bridge work at canal crossing west of I-86 junction (milepost 218). Loads wider than 15 foot from westbound I-84 and I-86 are to detour to I-84 Exit 228 to Idaho 81.
Last updated on June 7
Switch to Road Reports
Truck Restrictions on I-84
Map of Reports on I-84 Between Exit 28: 10th Street (Caldwell) and Exit 38: I-84B; Garrity Blvd (Nampa). Road construction work is in progress. The road is being repaved. The roadway is reduced to one lane. Consider using an alternate route. Speed restrictions are in force. Speed limit 65 MPH. From 5:00PM MDT to 10:00PM MDT on Friday and from 10:00PM MDT to 10:00PM MDT on weekends and from 10:00PM MDT to 3:00AM MDT on Monday. Until July 15, 2017 at about 5:00AM MDT. Between Exit 90: I-84B (13 miles west of the Mountain Home area) and Exit 71: Mayfield Road (14 miles east of the Boise area). Look out for a brush fire. Visibility is reduced. Drive with extreme caution. Between Exit 120: Bannock Avenue and Eastbound Bliss Rest Area (7 miles east of the Glenns Ferry area). Road maintenance work is in progress. There are alternating lane closures. Speed restrictions are in force. There is a width limit in effect. Width limit 10'0". Speed limit 70 MPH. Until September 29, 2017 at about 5:00PM MDT. Between Exit 173: US 93 and Exit 194: ID 25; Ridgeway Road (1 to 9 miles west of the Hazelton area). Road construction work is in progress. The roadway is reduced to two lanes. The road is being repaved. There is work on the shoulder. Speed restrictions are in force. There is a width limit in effect. Speed limit 70 MPH. Width limit 14'0". Until November 17, 2017 at about 8:00PM MDT. Between Exit 211: US 30; ID 24 and Exit 216: ID 25; ID 77 (5 miles east of the Heyburn area). The road is closed to traffic. A detour is in operation because of construction work. Until tomorrow at about 5:00AM MDT. Between Exit 211: US 30; ID 24 and Exit 222: I-86 (5 miles east of the Heyburn area). Look out for long term road construction work due to bridge construction work. The roadway is reduced to two lanes. Speed restrictions are in force. There is a width limit in effect. Drive with extreme caution. Speed limit 65 MPH. Width limit 15'0". Until July 28, 2017 at about 5:00PM MDT. Between Exit 222: I-86 and Exit 216: ID 25; ID 77 (6 to 7 miles east of the Heyburn area). Bridge maintenance work is in progress. The bridge is closed. There is a width limit in effect. Speed restrictions are in force. Follow the local detour. Speed limit 65 MPH. Width limit 15'0". Until August 18, 2017 at about 5:00PM MDT.
I-84: Road maintenance operations, alternating lane closures, speed restrictions in force, width limit in effect.
I-84 in both directions: Road construction, roadway reduced to two lanes, paving operations, work on the shoulder, speed restrictions in force, width limit in effect.
I-84: Road closed to traffic, detour in operation, because of construction work.
I-84 in both directions: Long term road construction, due to bridge construction work, roadway reduced to two lanes, speed restrictions in force, width limit in effect, drive with extreme caution.
I-84 westbound: Bridge maintenance operations, bridge closed, width limit in effect, speed restrictions in force, follow local detour.
East Boise Weigh Station
Cotterell Weigh Station
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup
Truck Ramp Truck Ramp Weigh Station Weigh Stations