US 95
US 95: Road construction, width limit in effect.
Between Exit 312 and Leon Road (6 miles north of the Lewiston area). Road construction work is in progress. There is a width limit in effect. Width limit 11'0". Speed limit 45 MPH . Until September 8.

Comment: Beginning June 12th a speed limit of 45 mph is in effect until July 31st. Road construction work is in progress on US-95 Lewiston Interchange Ramps from Milepost 312.52, to North of WA 195 Intersection to Milepost 319.52 beginning May 18th until September 8, 2015. There will be four 11 foot lanes open for the majority of the work. However, the locations of these lanes will change as work on the Hill progresses. There is a speed advisory of 45 mph and a lane width restriction of 11 foot, Monday through Sunday 24 Hours, 7 days a week. Traffic Control is Traffic Corp, Dan Edwards.
Last updated yesterday at 7:15am PDT
US 95: Road construction, paving operations, work on the shoulder, look out for flaggers, consider using an alternate route, speed restrictions in force, width limit in effect.
Between Conkling Road (near Worley) and ID 58 (1 mile north of the Worley area). Road construction work is in progress. The road is being repaved. There is work on the shoulder. Look out for flaggers. Consider using an alternate route. Speed restrictions are in force. There is a width limit in effect. Speed limit 35 MPH . Width limit 12'0". Until October 31.

Comment: US 95, between Conkling Road and ID 58 (1 mile north of the Worley area). Road construction work is in progress. Expect delays. Look out for flaggers. Reduce your speed. There is a width limit in effect. There is work on the shoulder. Truck speed limit 35 MPH. Expect 15-minute delays. Width limit 12'0". Unitl October 31. The Project Superintendent is M.A. DeAtley, Bill Brown, (509) 254-1341. Traffic control is Traffic Management Inc., Jesse Wood, (208) 660-3743.
Last updated yesterday at 7:14am PDT
Switch to Winter Driving Conditions
Switch to Road Reports
Truck Restrictions on US 95
Map of Reports on US 95 Between Exit 312 and Leon Road (6 miles north of the Lewiston area). Road construction work is in progress. There is a width limit in effect. Width limit 11'0". Speed limit 45 MPH. Until September 8. Between Conkling Road (near Worley) and ID 58 (1 mile north of the Worley area). Road construction work is in progress. The road is being repaved. There is work on the shoulder. Look out for flaggers. Consider using an alternate route. Speed restrictions are in force. There is a width limit in effect. Speed limit 35 MPH. Width limit 12'0". Until October 31.
US 95: Road construction, width limit in effect.
US 95: Road construction, paving operations, work on the shoulder, look out for flaggers, consider using an alternate route, speed restrictions in force, width limit in effect.
US 95: Lewiston Hill
US 95: Whitebird Hill
Bonners Ferry Weigh Station
Lewiston Weigh Station
Marsing Weigh Station
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup
Truck Ramp Truck Ramp Weigh Station Weigh Stations