Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
I-15
Between The Utah State Line and Exit 3: Woodruff Road (11 to 12 miles south of the Malad City area). The roadway is reduced to one lane. There are alternating lane closures. Road construction work is in progress. There is a width limit in effect. Width limit 10'0". Until September 12.

Comment: This Utah concrete rehabilitation project extends into Idaho on I-15 between milepost 0, Idaho-Utah border, and milepost 1, approximately 12 miles south of Malad. Traffic impacted 24/7. Motorists should use caution around crews and equipment.
Last updated on June 7
Switch to Winter Driving Conditions
Switch to Road Reports
Truck Restrictions on I-15
Map of Reports on I-15 Between The Utah State Line (12 miles south of the Malad City area) and Exit 31: ID 40; Downey Road (11 miles south of the Arimo area). Look out for mobile maintenance operations. From 7:00AM MDT to 5:30PM MDT on weekdays. Between The Utah State Line and Exit 3: Woodruff Road (11 to 12 miles south of the Malad City area). The roadway is reduced to one lane. There are alternating lane closures. Road construction work is in progress. There is a width limit in effect. Width limit 10'0". Until September 12. Between Exit 116: Sunnyside Road and Exit 119: US 20 (Idaho Falls). Road construction work is in progress. People are working in the median. There is work on the shoulder. The roadway is reduced to one lane. From 7:00AM MDT to 7:00PM MDT on weekdays. Until June 25.
I-15 in both directions: Roadway reduced to one lane, alternating lane closures, road construction, width limit in effect.
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup Truck Ramp Truck Ramp