Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
Truck Restrictions on I-84
I-84
Between Exit 211: US 30; ID 24 and Exit 222: I-86 (5 miles east of the Heyburn area). Look out for long term road construction work due to bridge construction work. The roadway is reduced to two lanes. Speed restrictions are in force. There is a width limit in effect. Drive with extreme caution. Speed limit 65 MPH. Width limit 15'0". Until June 2, 2017 at about 5:00PM MST.

Web Comment: Reconstruction of the Snake River twin bridges (milepost 216). eastbound bridge under construction. All traffic on westbound lanes. Reduce speed. Narrow lanes. Use caution at entry and exit ramps at Exit 216. Contractor: Ralph Wadsworth Construction, 801-301-2696

More Info: Detour and Alternate Routes
Last updated on January 24
Between Exit 222: I-86 and Exit 216: ID 25; ID 77 (6 to 7 miles east of the Heyburn area). Bridge maintenance work is in progress. The roadway is reduced to one lane. There is a width limit in effect. Speed restrictions are in force. A truck detour is in operation. Speed limit 65 MPH. Width limit 15'0". Until March 31, 2017 at about 5:00PM MST.

Web Comment: Bridge work at canal crossing west of I-86 junction (milepost 218). Loads wider than 15 foot from westbound I-84 and I-86 are to detour to I-84 Exit 228 to Idaho 81.
Last updated on January 24