US 20
US 20: Road construction, work on the shoulder, speed restrictions in force, width limit in effect.
Between Star Road and Black Cat Road (1 to 2 miles east of the Star area). Road construction work is in progress. There is work on the shoulder. Speed restrictions are in force. There is a width limit in effect. Speed limit 45 MPH . Width limit 12'0". Until August 14.

Comment: US20 (Chinden Blvd.) East and westbound oversize loads will be restricted to 10’ width while lanes are shifted to the south. The Contractor will pave the north half of US20 (Chinden Blvd.) on June 11th, 12th & 13th during daylight hours. The paving operation should not disrupt traffic on US20; however there will be trucks exiting and entering the highway. McDermott Rd. will be closed at Chinden Blvd. (US20) Friday 6/13/14. Local residential traffic may access McDermott Rd. from McMillian Rd.; however there is no access to US20 from McDermott Rd. Alternate routes include Star Rd. and Black Cat Rd. McDermott Rd. will be closed through early August.
Last updated yesterday at 10:32am MDT
US 20 in both directions: Road construction, roadway reduced to one lane, speed restrictions in force, width limit in effect.
Between Exit 332: South Rexburg and Exit 337: Salem Road (near Rexburg). Road construction work is in progress. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. Speed limit 55 MPH . Width limit 14'0". Until August 28.

Comment: Resurfacing 2.3 miles of U.S. 20, between the south Rexburg interchange (Exit 332) and the South Fork Teton River bridge. Work will proceed on both northbound and southbound lanes simultaneously, Monday through Thursday. there will also be some night work on July 21 as crews pave the ramps at exit 332 and 333

More Info: News Release
Last updated on July 19
US 20: Intersecting road closed, because the bridge is closed, detour in operation.
Between Exit 346: Bridge Street and US Route 20 Business; 2600 East Road (1 mile east of the St. Anthony area). The intersecting road is closed because the bridge is closed. A detour is in operation. Until October 1.

Comment: The Del Rio Bridge on the U.S. 20 business loop east of St. Anthony is closed for replacement. Traffic on the main U.S. 20 route will be unaffected. Please use the Bridge Street interchange on U.S. 20 in St. Anthony.

More Info: News Release
Last updated on July 3
US 20 in both directions: Road construction, roadway reduced to one lane, delays, speed restrictions in force, width limit in effect, look out for flaggers.
Between North River Road and Wood Road (4 to 7 miles east of the Ashton area). Road construction work is in progress. The roadway is reduced to one lane. Expect delays. Speed restrictions are in force. There is a width limit in effect. Look out for flaggers. Expect 30 - minute delays.. Speed limit 45 MPH . Width limit 11'0". Until October 9.

Comment: Reconstructing a three-mile stretch of U.S. 20 on the hill north of Ashton Monday through Thursday during daylight hours of each week. When crews are present, travel will be reduced to one lane. Motorists should consider taking I-15 between Idaho Falls and Montana. Truckers will not be allowed to use Idaho 47 as an alternate route. Commercial drivers transporting permitted loads wider than 11 feet need to contact Resident Engineer Wade Allen (208-745-5680) or Staff Engineer Bryan Young (208-745-5682) 24 hours in advance for special authorization to pass through the construction zone.

More Info: News Release
Last updated on June 24
US 20 in both directions: Road construction, because the road is being repaved, roadway reduced to one lane, look out for flaggers, pilot car in operation, delays, width limit in effect.
Between Sawtelle Road (Island Park) and The Montana State Line (3 miles east of the Island Park area). Road construction work is in progress because the road is being repaved. The roadway is reduced to one lane. Look out for flaggers. A pilot car is in operation. Expect delays. There is a width limit in effect. Expect 15 - minute delays.. Width limit 14'0". From 7:00AM MDT to 12:00PM MDT on Fridays and from 7:00AM MDT to 7:00PM MDT on Mondays, Tuesdays, Wednesdays and Thursdays. Until August 6.

Comment: Resurfacing a 12-mile stretch of highway, between Island Park Lodge and the Montana line. They will take down signs nightly, leaving the roadway open to the traveling public. Watch for uneven surfaces.

More Info: News Release
Last updated on July 8
Switch to Winter Driving Conditions
Switch to Road Reports
Truck Restrictions on US 20
Map of Reports on US 20 Between Star Road and Black Cat Road (1 to 2 miles east of the Star area). Road construction work is in progress. There is work on the shoulder. Speed restrictions are in force. There is a width limit in effect. Speed limit 45 MPH. Width limit 12'0". Until August 14. Between High Prairie Road and Swamp Road - Mink Lane (14 to 18 miles west of the Fairfield area). Road maintenance work is in progress. The roadway is reduced to one lane. Look out for flaggers. Short delays are possible. From 9:00AM MDT to 4:00PM MDT on Mondays and Tuesdays. Between ID 33 and Van Buren Boulevard (5 to 8 miles east of the Butte City area). Look out for large animals on the roadway. Drive with extreme caution. Between Exit 332: South Rexburg and Exit 337: Salem Road (near Rexburg). Road construction work is in progress. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. Speed limit 55 MPH. Width limit 14'0". Until August 28. Between Exit 346: Bridge Street and US Route 20 Business; 2600 East Road (1 mile east of the St. Anthony area). The intersecting road is closed because the bridge is closed. A detour is in operation. Until October 1. Between North River Road and Wood Road (4 to 7 miles east of the Ashton area). Road construction work is in progress. The roadway is reduced to one lane. Expect delays. Speed restrictions are in force. There is a width limit in effect. Look out for flaggers. Expect 30 - minute delays. Speed limit 45 MPH. Width limit 11'0". Until October 9. Between Sawtelle Road (Island Park) and The Montana State Line (3 miles east of the Island Park area). Road construction work is in progress because the road is being repaved. The roadway is reduced to one lane. Look out for flaggers. A pilot car is in operation. Expect delays. There is a width limit in effect. Expect 15 - minute delays. Width limit 14'0". From 7:00AM MDT to 12:00PM MDT on Fridays and from 7:00AM MDT to 7:00PM MDT on Mondays, Tuesdays, Wednesdays and Thursdays. Until August 6.
US 20: Road construction, work on the shoulder, speed restrictions in force, width limit in effect.
US 20 in both directions: Road construction, roadway reduced to one lane, speed restrictions in force, width limit in effect.
US 20: Intersecting road closed, because the bridge is closed, detour in operation.
US 20 in both directions: Road construction, roadway reduced to one lane, delays, speed restrictions in force, width limit in effect, look out for flaggers.
US 20 in both directions: Road construction, because the road is being repaved, roadway reduced to one lane, look out for flaggers, pilot car in operation, delays, width limit in effect.