US 93: Road construction, roadway reduced to one lane, because the road is being repaved, due to bridge construction work, delays, look out for flaggers, speed restrictions in force, width limit in effect.
Between 1700 North Road and 2500 North Road (5 miles south of the Hollister area). Road construction work is in progress. The roadway is reduced to one lane because the road is being repaved and due to bridge construction work. Expect delays. Look out for flaggers. Speed restrictions are in force. There is a width limit in effect. Expect 15 - minute delays.. Speed limit 55 MPH . Width limit 12'0". From 7:00AM MST to 7:00PM MST on weekdays. Until Wednesday, at about 7:00PM MST.

Web Comment: Repaving US 93 from Deep Creek to Hollister (milepost 20 to 27). From 7pm to 7am MDT, weekdays, width restrictions will be allowed up to 14 feet through the end of November. Jim Clawson contact 208-316-0517
Last updated on November 27
US 93: Construction work, intermittent lane closure, intersecting road closed, paving operations, speed restrictions in force, width limit in effect.
At 400 South Road (4 miles north of the Twin Falls area). Look out for construction work. A lane is closed intermittently. The intersecting road is closed. The road is being repaved. Speed restrictions are in force. There is a width limit in effect. Speed limit 45 MPH . Width limit 14'0". Until May 30, 2018 at about 7:00PM MST.

Web Comment: Realigning about a miles of US 93, near 400 South Road (milepost 54). Access to 400 South Road will be closed at times during construction.
Last updated on December 4
Switch to Winter Driving Conditions
Switch to Road Reports
Truck Restrictions on US 93
Map of Reports on US 93 Between Salmon Falls Creek Reservoir Road and 1900 North Road (6 to 16 miles south of the Hollister area). Look out for large animals on the roadway. Drive with extreme caution. Between 1700 North Road and 2500 North Road (5 miles south of the Hollister area). Road construction work is in progress. The roadway is reduced to one lane because the road is being repaved and due to bridge construction work. Expect delays. Look out for flaggers. Speed restrictions are in force. There is a width limit in effect. Expect 15 - minute delays. Speed limit 55 MPH. Width limit 12'0". From 7:00AM MST to 7:00PM MST on weekdays. Until Wednesday, at about 7:00PM MST. Between Challis Avenue; Sunset Street (Arco) and Spar Canyon Road (21 miles south of the Challis area). Watch for deer on the roadway. Look out for large animals on the roadway. Drive with extreme caution.
US 93: Road construction, roadway reduced to one lane, because the road is being repaved, due to bridge construction work, delays, look out for flaggers, speed restrictions in force, width limit in effect.
US 93: Construction work, intermittent lane closure, intersecting road closed, paving operations, speed restrictions in force, width limit in effect.