Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
Truck Restrictions on US 12
US 12

Between State Highway 13 Business and Harris Ridge Road (1 mile east of the Kooskia area). Road construction work is in progress. Bridge construction work is in progress. There is work on the shoulder. The roadway is reduced to one lane. Expect delays. Look out for flaggers. There is a width limit in effect. There is a height limit in effect. Width limit 12'0". Height limit 17'0". Until October 22, 2018 at about 6:00PM PDT.

Web Comment: The existing bridge will be removed and replaced at Milepost 86.8 with a new structure. Project will be completed in two phases and one lane of traffic will be maintained. Temporary Traffic Signals will be used 24 hours per day for the duration of the project to control traffic flow in each direction. Travelling public should expect delays.

Last updated on May 15

Between Pete King Creek Road and Bald Mountain (44 miles east of the Kooskia area). Bridge construction work is in progress. The roadway is reduced to one lane. Look out for flaggers. Speed restrictions are in force. There is a width limit in effect. Speed limit 25 MPH. Width limit 11'0". Until October 15, 2018 at about 6:00PM PDT.

Web Comment: The existing bridge will be removed and replaced at Milepost 120 with a new structure. Project will be completed in two phases and one lane of traffic will be maintained. Temporary Traffic Signals will be used 24 hours per day for the duration of the project to control traffic flow in each direction. Travelling public should expect delays. Workers present from 7:00AM PDT to 6:00PM PDT on Monday, Tuesday, Wednesday and Thursday until October 15.

Last updated on May 7