Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
Truck Restrictions on I-84
I-84
Between Exit 121 and Exit 125: 18th East Street (near Glenns Ferry). Bridge maintenance work is in progress. There are alternating lane closures. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. Speed limit 65 MPH . Width limit 14'0". Until June 16.

Web Comment: Concrete patching and road surface overlay on Snake River bridge at milepost 121.
Last updated on May 17
Between Exit 125: 18th East Street and Exit 129: Parks Loop Road (5 to 6 miles east of the Glenns Ferry area). Bridge maintenance work is in progress. There are alternating lane closures. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. Speed limit 65 MPH . Width limit 14'0". Until June 16.

Web Comment: Concrete patching and road surface overlay on Snake River bridge at milepost 128.
Last updated on May 23
Between Exit 194: ID 25; Ridgeway Road and I-84 (6 miles west of the Hazelton area). Road maintenance work is in progress. The right lane is closed because the road is being repaved. Drive with extreme caution. Speed restrictions are in force. There is a width limit in effect. Width limit 13'0". Speed limit 65 MPH . From 8:00AM MDT to 5:00PM MDT on Mondays, Tuesdays, Wednesdays and Thursdays. Until June 6, 2017.

Web Comment: Pavement repair work at two bridge locations between mileposts 184 and 190.
Last updated on May 24
Between Exit 188: Valley Road and Exit 194: ID 25; Ridgeway Road (near Hazelton). A lane is closed. Bridge maintenance work is in progress. The right lane is closed. There is a width limit in effect. Short delays are possible. Width limit 16'0". Until May 31.

Web Comment: Road repair due to potholes. Expect slow moving traffic. Drive with Care
Last updated on May 6
Between Exit 211: US 30; ID 24 and Exit 222: I-86 (5 to 6 miles east of the Heyburn area). Look out for long term road construction work due to bridge construction work. The roadway is reduced to two lanes. Speed restrictions are in force. There is a width limit in effect. Drive with extreme caution. Speed limit 65 MPH . Width limit 12'0". Until June 2, 2017.

Web Comment: Reconstruction of the Snake River twin bridges (milepost 216). Westbound bridge under construction. All traffic on eastbound lanes. Reduce speed. Narrow lanes. Use caution at entry and exit ramps at Exit 216. Contractor: Ralph Wadsworth Construction, 801-301-2696

More Info: Detour and Alternate Routes
Last updated on May 17
Between Sweetzer Summit and The Utah State Line (57 to 65 miles east of the Heyburn area). The road is being repaved. The roadway is reduced to two lanes. Speed restrictions are in force. There is a width limit in effect. Speed limit 65 MPH . Width limit 14'0". Until July 29.

Web Comment: Paving project between (milepost 268 to 275). Two way traffic for the duration of the project.
Last updated on May 17