Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
Truck Restrictions on US 95
US 95
Between Sportsman Access Road and Sportsman Access Road (6 miles south of the White Bird area). Bridge construction work is in progress. The roadway is reduced to one lane. Look out for temporary traffic lights. Truck restrictions are in force. Width limit 14'0". Until September 30.

Comment: This work at Milepost 216.5 is to remove and replace the Award Bridge deck. Motorists are advised to watch for workers and equipment working on either side of the roadway while construction is in progress. The current width restriction of 14'0" is in force. Idaho Traffic Control can be contacted at (208) 455-3220 for coordinating wide load movement through the project.
Last updated yesterday at 7:10am PDT
Between Johnston Road and Seltice Avenue (near Plummer). Bridge construction work is in progress. Speed limit 20 MPH . Width limit 14'0". Until tomorrow at about 7:00PM PDT.

Comment: Plummer Creek Culvert at MP 394.44 has been replaced and US-95 will be open to two lane traffic on Thursday 8/14/14. The 20 mile per our speed limit will remain in effect through this zone until paving is completed on Monday 8/18/14 at which time the speed limit will be returned to 45 mph. Excavation on the other Plummer Creek Culvert at MP 395.05 will begin on Thursday 8/14/14. Traffic will be reduced to one lane through this zone at that time and the speed limit will be reduced to 20 mph. A 14' width restriction will be in effect through this MP 395.05 zone during construction.
Last updated on August 13