Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
Truck Restrictions on US 26
US 26
Between University Avenue and Washington Street (near Gooding) and Belafone Road (3 miles west of the Shoshone area). Road construction work is in progress. Expect single line traffic alternating directions because the road is being repaved. Look out for loose gravel on the roadway. Expect delays. Look out for flaggers. A pilot car is in operation. Speed restrictions are in force. There is a width limit in effect. Expect 15 - minute delays.. Speed limit 35 MPH . Width limit 12'0". From 7:00AM MDT to 7:00PM MDT on weekdays and Saturdays. Until October 21.

Web Comment: Roadway rehabilitation, base repair and paving work between Gooding and Shoshone (milepost 150 to 162). Traffic will be on unpaved surface for duration of project.
Last updated on September 26
Between Old Highway 93 and Old Highway 93; Griffin Loop Road (1 mile west of the Carey area). Bridge maintenance work is in progress. The roadway is reduced to one lane. Expect single line traffic alternating directions. The road is being repaved. Look out for temporary traffic lights. Expect delays. There is a width limit in effect. Expect 5 - minute delays.. Width limit 12'0". Until October 28.

Web Comment: Repair of the Little Wood River bridge south of Carey (milepost 200).
Last updated on September 27
Between South Boulevard and F Street (Idaho Falls). There is a height limit in effect. Height limit 13'8".

Web Comment: There is a permanent height restriction of 13 feet 8 inches on the westbound underpass south of G Street in Idaho Falls. The underpass runs beneath the transportation department's South Boulevard Bridge and the Union Pacific's Railroad Bridge, which bridges lie side by side over U.S. 26 (Yellowstone Highway) at milepost 333.51 in Idaho Falls.
Last updated on September 8
Between F Street and South Boulevard (Idaho Falls). There is a height limit in effect. Height limit 13'8".

Web Comment: There is a permanent height restriction of 13 feet 8 inches on the eastbound underpass south of G Street in Idaho Falls. The underpass runs beneath the transportation department's South Boulevard Bridge and then beneath the Union Pacific Railroad bridge, which bridges lie side by side over U.S. 26 (Yellowstone Highway) at milepost 333.51 in Idaho Falls.
Last updated on September 8