Truck Restrictions on I-84
I-84
Between The Oregon State Line (near Fruitland) and Exit 17: Sand Hollow (12 miles west of the Caldwell exit). Road construction work is in progress. There is work on the shoulder. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. Speed limit 65 MPH . Width limit 14'0". Until October 31.

Comment: The normal operating hours for this project will be Monday through Friday, 6 AM to 8 PM from June 16th until October 31, 2014. Traffic will be placed into a two-way, opposing single lane configuration. Crossovers will be located at MP0.25, either side of IC 03, and west of IC 13. The Westbound on and off ramps at Interchange 09, (US30) will be closed until early September. Motorists are advised to use alternate routes at IC 03 or at IC 13. Motorists are advised to use Exit 3, US95 and proceed north to US30. A signed detour will be posted to direct traffic to east to IC 13, where they will be directed over to the westbound direction.
Last updated on August 18
Between Exit 29: US 20; Franklin Road and Exit 38: I-84B (near Nampa). Road construction work is in progress. Bridge construction work is in progress. The roadway is reduced to one lane. There is a width limit in effect. Speed limit 55 MPH . Until October 3.

Comment: Width limit in effect ONLY at night, 14' (9pm to 5am). no restruction during the day, (5am to 9pm). Traffic will be open in both lanes in each direction at the normal speed between 5:00 am and 9:00 pm. Traffic may be reduced to ONE lane in each direction between 9:00 pm and 5:00 am for night work
Last updated yesterday at 9:22am MDT
Between Exit 54: US 20; Broadway Avenue and Exit 60: The Isaacs Canyon Interchange (near Boise). Road construction work is in progress. Bridge construction work is in progress. There is work on the shoulder. People are working in the median. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. A detour is in operation. Speed limit 55 MPH . Width limit 12'0". Until October 1, 2015.

Comment: I-84 Loads over 12’ wide are being detoured between exits 57 and 59 via Federal Way and Eisenman Roads. This restriction will be in place until late October 2014. Eastbound on ramp will be closed between 7/28/14 and 8/24/14 (detour using Federal Way and Eisenman Interchange (exit 60)
Last updated on August 18
At Exit 125: 18th East Street (3 miles east of the Glenns Ferry area). Bridge maintenance work is in progress. Traffic restrictions are in force. On. Overpass. The roadway is reduced to one lane. There is a width limit in effect. Width limit 13'0". Until August 29.

Comment: Bridge resurfacing project affecting local roadway at Paradise Valley/Exit 125. No restrictions on Interstate 84. Contractor: L&J Construction, 406-599-7776
Last updated on July 22
Between Exit 137 and Exit 141: I-84B; US 26 (near Bliss). Bridge maintenance work is in progress. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. Speed limit 65 MPH . Width limit 13'0". Until August 29.

Comment: Bridge resurfacing project on Union Pacific Railroad overpass west of Exit 141. Watch for trucks entering and exiting work zone. Wide loads must use I-84 business loop between Exits 137 and 141 through Bliss. Contractor: L&J Construction, 406-599-7776
Last updated on July 22
Between Exit 245: 1400S Road and Exit 254: Sweetzer Road (34 to 42 miles east of the Heyburn area). The road is being repaved. Look out for loose gravel on the roadway. The roadway is reduced to one lane. Observe speed limits. There is a width limit in effect. Increase normal following distance. Speed limit 65 MPH . Width limit 13'0". From 9:00AM MDT to 7:00PM MDT on weekdays. Until Friday, at about 7:00PM MDT.

Comment: Crews completing a seal coat on I 84 between Sublett interchange and Sweetzer interchange (milepost 245 to 254). Use caution.
Last updated on August 4