Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
Truck Restrictions on US 95
US 95
Between County Road (14 miles north of the New Meadows area) and Pinehurst Road (11 miles south of the Riggins area). Road construction work is in progress. There is work on the shoulder. The roadway is reduced to one lane. Look out for flaggers. Expect delays. There is a width limit in effect. Speed restrictions are in force. Width limit 14'0". Expect 5 - minute delays.. Speed limit 35 MPH . From 7:00AM MDT to 7:00PM MDT on weekdays. Until August 13.

Comment: Traffic is reduced to a single lane at mp 177.1 with a temporary traffic signal to allowing traffic through the site until work is completed. It is expected to take approximately 10 days at each location to complete the work.
Last updated on July 14
Between Sportsman Access Road and Sportsman Access Road (6 miles south of the White Bird area). Bridge construction work is in progress. The roadway is reduced to one lane. Look out for temporary traffic lights. Truck restrictions are in force. Width limit 14'0". Until August 5.

Comment: This work at Milepost 216.5 is to remove and replace the Award Bridge deck. Motorists are advised to watch for workers and equipment working on either side of the roadway while construction is in progress. The current width restriction of 14'0" is in force. Idaho Traffic Control can be contacted at (208) 455-3220 for coordinating wide load movement through the project.
Last updated on July 25
Between Johnston Road and Seltice Avenue (near Plummer). Bridge construction work is in progress. Speed limit 20 MPH . Width limit 14'0". Until September 19.

Comment: Plummer Creek culverts will be replaced at MP 394.44 and MP 395.05 crossings. Only one culvert replacement will be under construction at any given time. Single lane traffic with width and speed restrictions will be in effect only through the immediate workzone.
Last updated on July 16
Between Washington Street - Madison Street and Comance Street (Bonners Ferry). Bridge maintenance work is in progress. Look out for flaggers. The roadway is reduced to two lanes. Speed limit 25 MPH . Width limit 10'0". Until September 2.

Comment: Width Restriction set at 10ft - "All permitted nonreducible vehicle/loads are restricted - MUST call 208-819-3432 or 208-659-6226 to see if length can be accommodated thru project. It may be possible to get wide loads through between 5:00 am - 6:00 am. with a 24 hour notice. Please call one of the numbers listed above for scheduling or any questions.
Last updated on July 24